{":id":"row-p6hj-5urz~h8zh",":version":"rv-85rn.4wes~u3va",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"2711","title":"Hunter North and South Substations","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Traction Power']","description":"MTA substations convert utility power into the 650-volt DC that moves trains. This project reinvests in the Hunter North and South substations on the E & M lines to replace aging equipment and stabilize traction power.","services":"['NYCT-E', 'NYCT-M']","capital_plans":"['9', '8']","districts":"['CO-081']","prime_contractor":"NEW YORK CITY TRANSIT AUTHORITY","contract_number":"P36730","contract_type":"DBB (A+B)","initiatives":"['Reliability','Sustainability','Enabled by Congestion Relief']"},
{":id":"row-8862_xh32-cmj8",":version":"rv-7xey-kvgd~43z6",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"8356","title":"NYCT ADA Station Improvements: 149 St Complex & Tremont Av","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making the 149 St Grand Concourse complex and Tremont Av BD stations accessible and improving the station environments. At 149 St Grand Concourse, we will construct new customer circulation areas, make critical state of good repair upgrades, and add new elevators and digital customer information screens. At Tremont Av, we will install new elevators, reconstruct staircases, and renew platform edges. Together, these projects will make these stations fully accessible.","services":"['NYCT-QN', 'NYCT-B', 'NYCT-D', 'NYCT-4', 'NYCT-2', 'NYCT-5']","capital_plans":"['9', '7']","districts":"['CO-081', 'CO-005']","prime_contractor":"TULLY CONSTRUCTION CO., INC.","contract_number":"A37150E","contract_type":"Design Build","initiatives":"['Accessibility']","budget_status":"2","schedule_status":"3","start_date":"2020-08-01T00:00:00.000","goal_completion_date":"2023-07-04T00:00:00.000","estimated_actual_completion_date":"2026-07-31T00:00:00.000","goal_project_cost":"160409177","estimated_actual_project_cost":"168829388"},
{":id":"row-cve3-dvn6~kjgx",":version":"rv-vgbp-zdvg~ayb2",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"8616","title":"Rehab: Police District Office #4 - 14 Street-Union Square","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Misc/Emergency']","description":"Station and support facilities need periodic renewal to stay safe and functional. This project rehabilitates the Police District Office at 14 St–Union Square.","capital_plans":"['8']","districts":"['CO-061']","prime_contractor":"NEW YORK CITY TRANSIT AUTHORITY","contract_number":"C43760","contract_type":"DBB (A+B)","initiatives":"['Safety']","schedule_status":"1","start_date":"2026-04-01T00:00:00.000","goal_completion_date":"2028-02-29T00:00:00.000","estimated_actual_completion_date":"2028-02-29T00:00:00.000","estimated_actual_project_cost":"48087750"},
{":id":"row-h5yk.xitj_bfvq",":version":"rv-n7h9.3c6h.kc5s",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9715","title":"Grand Central Terminal Security Cameras & Expansion","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Metro-North Railroad']","asset_categories":"['Miscellaneous']","description":"Communications and security systems support safe operations and incident response. This project upgrades and expands security camera coverage at Grand Central Terminal.","services":"['MNR-1', 'MNR-2', 'MNR-3']","capital_plans":"['8']","districts":"['CO-061']","contract_type":"DBB (IFB)","initiatives":"['Safety']"},
{":id":"row-nj7x~cbng-hxc8",":version":"rv-wuqu_rheq_i56m",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9718","title":"Brewster Yard Improvements Program","stage":"Planning","phase":"Planned","agencies":"['Metro-North Railroad']","asset_categories":"['Shops & Yards']","description":"We are expanding railcar servicing and maintenance capabilities on Metro-North’s Harlem Line through a planned multi-phase project at the Brewster Complex in Putnam County. The project will include reconfiguring and extending the railyard to accommodate new and longer trains and better service the fleet. Phase One of the Project will facilitate yard expansion by relocating the Southeast Station customer surface parking to a new facility adjacent to the station featuring a new pedestrian overpass and improved vehicular access.","capital_plans":"['7']"},
{":id":"row-95x9_ex3q_ixtv",":version":"rv-zwv2.s3w2.55ab",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11097","title":"NYCT ADA Station Improvements and Renewal: Borough Hall","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making this station accessible and improving the station environment. This project will fully renew the Borough Hall 4/5 station and make it fully accessible. We will add 3 new elevators, widen and upgrade staircases, and reconfigure parts of the station to accommodate the new accessible features. As part of the renewal work, we will replace platform edges and wall tiles, repair steel beams and girders that keep the station safe and waterproof the station roof.","services":"['NYCT-4', 'NYCT-5']","capital_plans":"['8', '9']","districts":"['CO-047']","prime_contractor":"JUDLAU CONTRACTING, INC.","contract_number":"A37145","contract_type":"Design Build","initiatives":"['Accessibility']","budget_status":"0","schedule_status":"3","start_date":"2022-12-01T00:00:00.000","goal_completion_date":"2025-04-28T00:00:00.000","estimated_actual_completion_date":"2026-08-06T00:00:00.000","goal_project_cost":"167216178","estimated_actual_project_cost":"164652194"},
{":id":"row-ttr9~4rh2_tjyp",":version":"rv-24q7~9aub.feut",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11109","title":"Structural Repairs: 9 Ave / WST","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Line Structures']","description":"Line structures—bridges, viaducts, and tunnels—need sustained investment to slow deterioration. This project performs structural repairs at the 9 Ave (D) on the West End Line.","services":"['NYCT-D']","capital_plans":"['8']","districts":"['CO-047']","prime_contractor":"J-TRACK LLC","contract_number":"A36203","contract_type":"DBB (A+B)","initiatives":"['Safety','Enabled by Congestion Relief']","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2027-08-30T00:00:00.000","estimated_actual_completion_date":"2027-08-18T00:00:00.000","goal_project_cost":"45019776","estimated_actual_project_cost":"45019776"},
{":id":"row-whzd~yghk-4a83",":version":"rv-4ezc-k2n5.ehjk",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11134","title":"NYCT ADA Station Improvements: Broadway Junction","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Track', 'Passenger Stations']","description":"We are making crucial investments to improve accessibility, circulation, and design at Broadway Junction, Brooklyn's third largest subway station. We’re adding 7 new elevators, a new entrance on Van Sinderen Avenue, refinishing platforms, and improving the passageways that connect the station.  ADA accessibility at Broadway Junction will be transformative for the public realm around the station. ADA accessibility at Broadway Junction will be transformative for the public realm around the station. Read more about this project at mta.info/project/investing-Broadway-junction","services":"['NYCT-J', 'NYCT-Z', 'NYCT-L', 'NYCT-A', 'NYCT-C']","capital_plans":"['8', '9']","districts":"['CO-047']","prime_contractor":"ECCO III ENTERPRISES, INC.","contract_number":"A37130A","contract_type":"Design Build","initiatives":"['Accessibility']","budget_status":"1","schedule_status":"1","start_date":"2023-12-01T00:00:00.000","goal_completion_date":"2027-09-07T00:00:00.000","estimated_actual_completion_date":"2027-09-07T00:00:00.000","goal_project_cost":"380648885","estimated_actual_project_cost":"387298885"},
{":id":"row-ak5s_scxw~nu5j",":version":"rv-gx4w_yh2v-hwin",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11194","title":"Station Renewal: Chambers St / Nassau Line","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project renews Chambers St on the Nassau St Line with targeted repairs and upgrades to improve the station environment.","capital_plans":"['8']","contract_type":"Design Build","initiatives":"['Enabled by Congestion Relief']"},
{":id":"row-3yam.7gy3-d4jh",":version":"rv-kifx~ktjb_rp5c",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11271","title":"Rehabilitate Emergency Exits: Various Locations System-wide","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Line Structures']","description":"This project rehabilitates emergency exits at select locations and upgrades life-safety features to improve emergency evacuation conditions.","capital_plans":"['8']","contract_number":"C35338","contract_type":"DBB (A+B)"},
{":id":"row-76e9-7yrc_5axx",":version":"rv-8rjp-8huc-kqya",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11308","title":"Elevator Replacement at the Kingsbridge and Michael J. Quill Bus Depots","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Depots']","description":"This project replaces four elevators at two at Kingsbridge and two at the Michael J. Quill Depot with modern units.","capital_plans":"['8']","contract_number":"C40282","contract_type":"DBB (A+B)"},
{":id":"row-24xq-549m_zy8z",":version":"rv-6kpi.r3g8-n9b7",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11312","title":"Rehab Ducts: Hanover Sq/Pearl St Substation - CLK","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Traction Power']","description":"This project rehabilitates substation ducts serving the Hanover Sq / Pearl St substation to support reliable traction power.","services":"['NYCT-2', 'NYCT-3']","capital_plans":"['8']","districts":"['CO-061']","contract_number":"P36510","contract_type":"DBB (IFB)","initiatives":"['Reliability','Sustainability','Enabled by Congestion Relief']"},
{":id":"row-huyu.8gqv~4gm2",":version":"rv-zwre_nunj.afu8",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11335","title":"1 Subway Str Stair: 8 St / BWY (S5) [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project repairs or replaces one subway street stair at 8 St on the Broadway Line to improve safety and station access. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8']","prime_contractor":"MR RESTORATION CORP","contract_number":"A37331","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"0","start_date":"2025-08-01T00:00:00.000","goal_completion_date":"2026-05-08T00:00:00.000","estimated_actual_completion_date":"2026-04-30T00:00:00.000","goal_project_cost":"686320","estimated_actual_project_cost":"696320"},
{":id":"row-p4rb.c4g2_h95u",":version":"rv-uvt4~dzpt.c24b",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11353","title":"Station Work: 4 Locations/Second Avenue","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project will upgrade selected station components to address current operating experience. This work will be delivered at four locations on the Second Avenue (Q) line.","services":"['NYCT-F', 'NYCT-Q']","capital_plans":"['8']","districts":"['CO-061']","contract_type":"DBB (A+B)"},
{":id":"row-2dy8~fy3v.chga",":version":"rv-kxyf_9pxv~nsgk",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11359","title":"Sandy Resiliency (Street Level Openings): Various Locations System-wide","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Security / Disaster Recovery']","asset_categories":"['Passenger Stations']","description":"As part of the MTA's resilience program, this project evaluates and advances protections for select street-level openings and other vulnerabilities to reduce flood and coastal surge risk in the subway system.","capital_plans":"['T']","contract_type":"DBB (A+B)"},
{":id":"row-me3s_whxe.zbts",":version":"rv-sqzf.sa7v_rets",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11405","title":"Upgrade / Replace PBX-2 at Jay St","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"We’re upgrading the station voice communications at the Jay Street complex. The new IP-based system will support Help Point intercoms, emergency and maintenance phones, booth lines, and station paging/announcements, with backup power and redundant network paths.","services":"['NYCT-A', 'NYCT-C', 'NYCT-F','NYCT-A']","capital_plans":"['8']","districts":"['CO-047']","prime_contractor":"EXTERNETWORKS INC","contract_number":"D37493","contract_type":"DBB (A+B)","initiatives":"['Reliability','Safety']","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2027-12-29T00:00:00.000","estimated_actual_completion_date":"2027-12-29T00:00:00.000","goal_project_cost":"15183307","estimated_actual_project_cost":"15183307"},
{":id":"row-rb8u-shk6_jxs5",":version":"rv-4du6~jy3p.ebxf",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11414","title":"Public Address / Customer  Information Screens: Upgrade Legacy Systems at 71 B-Division Stations","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"Customer information systems help riders navigate the system. This project upgrades legacy public address and customer information systems at B Division stations, improving announcements and digital signage for clearer service information.","capital_plans":"['8']","contract_number":"W32810","contract_type":"DBB (A+B)"},
{":id":"row-9556.wyhi-byss",":version":"rv-n849-zkcr-85kr",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11415","title":"Signal Uninterrupted Power Supply System Upgrade","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"This project upgrades Uninterruptible power supplies (UPS) equipment to improve reliability for essential communications and controls during outages.","capital_plans":"['8']","contract_number":"S32479","contract_type":"DBB (IFB)"},
{":id":"row-4xst-6qaw.yzzw",":version":"rv-z8vn~rvqu-7wnd",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11536","title":"CBTC: Fulton/Liberty Lines","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication', 'Line Equipment', 'Signals & Communications', 'Track']","description":"As part of the MTA’s signal modernization program, we’re installing Communications-Based Train Control (CBTC) on the Fulton Street Line in Brooklyn and the Liberty Avenue Line in Queens, which serve the A and C trains. This work replaces aging signals and interlockings and will enable more frequent, more reliable service.","services":"['NYCT-A', 'NYCT-C', 'NYCT-F']","capital_plans":"['8', '9']","districts":"['CO-047', 'CO-061', 'CO-081']","prime_contractor":"L.K. COMSTOCK & COMPANY LLC","contract_number":"S48019","contract_type":"Design Build","initiatives":"['Signal Modernization', 'Reliability','Enabled by Congestion Relief']","budget_status":"1","schedule_status":"3","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2031-12-31T00:00:00.000","estimated_actual_completion_date":"2032-05-11T00:00:00.000","goal_project_cost":"1914938236","estimated_actual_project_cost":"1914938236"},
{":id":"row-n944~8agp-a4mr",":version":"rv-f6g2.s26n-397u",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11537","title":"CBTC: Queens Boulevard East Install","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Track', 'Signals & Communication']","description":"Signals and train control enable safe, reliable train movements. This project installs CBTC on Queens Boulevard East to modernize the signal system.","services":"['NYCT-A', 'NYCT-C', 'NYCT-E', 'NYCT-F']","capital_plans":"['8', '9']","districts":"['CO-047', 'CO-081']","contract_type":"DBB (A+B)","initiatives":"['Signal Modernization', 'Reliability']"},
{":id":"row-m4ch_mnzp-8r9c",":version":"rv-h3ze-bsx8.vex4",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11543","title":"CBTC 6 Av / 63 St (Signal System and Selected Adjacent Infrastructure)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication', 'Line Equipment', 'Signals & Communications', 'Traction Power', 'Track']","description":"Signals and train control enable safe, reliable train movements. This project installs Communications-Based Train Control (CBTC) on the 6 Av/63 St corridor to modernize the signal system and improve service reliability.","capital_plans":"['8', '9']","contract_type":"Design Build"},
{":id":"row-hz3b~kc7u~57bv",":version":"rv-jbws-mukd_vjwt",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11614","title":"VHF: Portable Radio Replacement","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"Reliable radio communications support safe operations and emergency response. This project replaces portable Very-High Frequency (VHF) radios used by field staff to improve coverage and reliability.","capital_plans":"['8']","contract_number":"W32531","contract_type":"Purchase (RFP)","budget_status":"1","start_date":"2025-07-01T00:00:00.000","goal_project_cost":"11736075","estimated_actual_project_cost":"11736075"},
{":id":"row-c2tt-t9n8.yk8m",":version":"rv-grpj-6dd5~a327",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11619","title":"Component Repairs: Coney Island Overhaul Facility","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Shops & Yards']","description":"Shops and yards keep fleets service-ready. This project delivers component repairs at the Coney Island Overhaul Facility.","capital_plans":"['8']","prime_contractor":"FOS DEVELOPMENT CORP","contract_number":"C35336","contract_type":"DBB (A+B)","initiatives":"['Reliability','Enabled by Congestion Relief']","budget_status":"1","schedule_status":"2","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2028-03-31T00:00:00.000","estimated_actual_completion_date":"2028-04-07T00:00:00.000","goal_project_cost":"40801060","estimated_actual_project_cost":"40801060"},
{":id":"row-maq7.tyy7.xhbp",":version":"rv-dwr5_edr2.9yak",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11620","title":"DCE Shop Components: Various Facilities (2020-2024)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Shops & Yards']","description":"Maintenance facilities require regular replacement of worn systems. This project replaces shop components across various facilities. Exact locations to be announced on Solicitation Notice.","capital_plans":"['8']","contract_type":"In House","initiatives":"['Reliability','Enabled by Congestion Relief']"},
{":id":"row-u6x3-qsdz-qzh2",":version":"rv-2kwx_hc6v.6ntc",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11642","title":"Purchase 435 B-Division Cars - R211 Option 2","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Subway Cars']","description":"This project purchases additional R211 subway cars for the B Division to modernize the fleet and improve reliability and the customer experience.","capital_plans":"['8']","prime_contractor":"KAWASAKI RAIL CAR, INC.","contract_number":"R34211","contract_type":"DBB (RFP)","budget_status":"1","schedule_status":"1","start_date":"2025-01-01T00:00:00.000","goal_completion_date":"2028-11-30T00:00:00.000","estimated_actual_completion_date":"2028-11-30T00:00:00.000","goal_project_cost":"1389664203","estimated_actual_project_cost":"1389664203"},
{":id":"row-3d3r_mwsy.s4qy",":version":"rv-3ugs-7uqt~ydb8",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11761","title":"Rehabilitation of Manhattan Tunnel Entrance/Exit - Hugh L Carey Tunnel","stage":"Construction","phase":"Construction","agencies":"['Bridges And Tunnels']","asset_categories":"['Structures']","description":"We’re improving the Manhattan entrance to the Hugh L. Carey Tunnel to make it safer and move traffic more smoothly. We’ll reconfigure the plaza, repave and restripe, upgrade lighting and drainage, fix walls and structures, and improve the Morris St pedestrian overpass and curb ramps. We’re also replacing over-height vehicle sensors and the fire standpipe, adding a flood-equipment storage area, and refreshing drains and pavement through both tunnel tubes.","services":"['BT-HC']","capital_plans":"['8']","prime_contractor":"J-TRACK LLC","contract_number":"HC-48","contract_type":"DBB (IFB)","initiatives":"['Resilience','Safety']","budget_status":"1","schedule_status":"0","start_date":"2025-09-01T00:00:00.000","goal_completion_date":"2026-12-30T00:00:00.000","estimated_actual_completion_date":"2026-08-29T00:00:00.000","goal_project_cost":"38739466","estimated_actual_project_cost":"38739466"},
{":id":"row-8cna.mxdg-v32m",":version":"rv-kuyp-nmte~55dv",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11794","title":"Widening of S/B FDR Drive - 125 St to 116 St","stage":"Construction","phase":"Construction","agencies":"['Bridges And Tunnels']","asset_categories":"['Roadways & Decks']","description":"This project adjusts the southbound FDR Drive between 125 St and 116 St to improve traffic flow and safety near the RFK Bridge approaches. The work includes replacing the East 120 St pedestrian bridge and ramps with a new ADA-accessible crossing that supports shared use and helps connect to the future East River Greenway.","capital_plans":"['8']","prime_contractor":"DEFOE CORP","contract_number":"RK-90","contract_type":"Design Build","budget_status":"2","schedule_status":"1","start_date":"2025-06-01T00:00:00.000","goal_completion_date":"2026-08-08T00:00:00.000","estimated_actual_completion_date":"2026-08-30T00:00:00.000","goal_project_cost":"31519907","estimated_actual_project_cost":"33756379"},
{":id":"row-mmnx~y5m9_ctcs",":version":"rv-y7ns-b9j5-7usi",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11806","title":"VNB Ph.2 -Reconstruction of Upper Level Approach","stage":"Construction","phase":"Construction","agencies":"['Bridges And Tunnels']","asset_categories":"['Roadways & Decks']","description":"This project will rehabilitate and reconstruct portions of the Verrazzano-Narrows Bridge upper-level approach ramps and reconfigure exits to improve safety and traffic flow.","capital_plans":"['8']","prime_contractor":"VNB CONSTRUCTION COMPANY","contract_number":"VN-84B","contract_type":"Design Build","budget_status":"0","schedule_status":"1","start_date":"2025-08-01T00:00:00.000","goal_completion_date":"2029-07-10T00:00:00.000","estimated_actual_completion_date":"2029-07-10T00:00:00.000","goal_project_cost":"570335182","estimated_actual_project_cost":"535831656"},
{":id":"row-xsit-ggv6_6u8f",":version":"rv-fa7w.qcqv~h2am",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11843","title":"Bridge Replacement Program - Highway Bridges","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Long Island Rail Road']","asset_categories":"['Line Structures']","description":"Bridges must be renewed to maintain safety and extend service life. This program replaces aging highway bridges. Exact locations to be announced on Solicitation Notice.","capital_plans":"['8']","initiatives":"['Safety']"},
{":id":"row-agas.5up3~smav",":version":"rv-yqfb_jt63.thm7",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"11896","title":"Structural Repairs and Painting, 9th Ave Portal to Stillwell","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Line Structures']","description":"Elevated structures need steel repair and protective coatings to prevent corrosion. This project performs structural repairs and painting from the 9th Ave portal to Stillwell Ave on the (D) line.","services":"['NYCT-D']","capital_plans":"['8', '9']","districts":"['CO-047']","contract_type":"DBB (A+B)","initiatives":"['Safety','Enabled by Congestion Relief']"},
{":id":"row-xte7.kjrd-wdgg",":version":"rv-7fc9~4dir.6br2",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12019","title":"Rebuild Marble Hill Retaining Wall - Phase 1","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Metro-North Railroad']","asset_categories":"['Track & Structures']","description":"This project advances inspection, design, and priority repairs for the Marble Hill retaining wall along the Hudson Line to protect track stability and the right-of-way.","capital_plans":"['8']","contract_type":"DBB (RFP)"},
{":id":"row-8zwg-hvr7.ncdw",":version":"rv-t5aa_wfg4~s8yi",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12032","title":"Purchase 316 M9A Railcars","stage":"Construction","phase":"Construction","agencies":"['Metro-North Railroad']","asset_categories":"['Rolling Stock']","description":"This project purchases new 316 M9A railcars for the Long Island Rail Road and Metro-North Railroad, modernizing the fleet and improving reliability, customer comfort, and onboard systems.","capital_plans":"['9']","prime_contractor":"ALSTOM TRANSPORTATION, INC.","contract_number":"237848","contract_type":"Purchase (IFB)","budget_status":"1","schedule_status":"1","start_date":"2025-07-01T00:00:00.000","goal_completion_date":"2028-12-31T00:00:00.000","estimated_actual_completion_date":"2028-12-31T00:00:00.000","goal_project_cost":"2782144933","estimated_actual_project_cost":"2855199633"},
{":id":"row-937z.exsn~iuv2",":version":"rv-f4p5_7f3a.us8s",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12034","title":"Grand Central Terminal Fire Stand Pipe - Phase 2","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Metro-North Railroad']","asset_categories":"['Stations']","description":"This project continues replacement of the fire standpipe system in Grand Central Terminal to improve reliability.","capital_plans":"['8']","contract_type":"DBB (RFP)"},
{":id":"row-xeji~dr3p-fwcp",":version":"rv-8scb~pftz.c6zg",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12040","title":"MNR ADA Station Improvements: Woodlawn, Botanic Garden, Williams Bridge","stage":"Construction","phase":"Construction","agencies":"['Metro-North Railroad']","asset_categories":"['Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making the Botanical Gardens, Williams Bridge, and Woodlawn Metro-North stations accessible and improving the station environment. We will completely rebuild the Williams Bridge and Woodlawn stations and make them accessible with new elevators at each platform. The Botanical Garden station will receive new elevators, structural repairs, new platform features, and a rehabilitation of the historic station canopy, among other improvements.","services":"['MNR-1', 'MNR-2']","capital_plans":"['8']","districts":"['CO-005']","prime_contractor":"MLJ CONTRACTING CORP.","contract_number":"MN1000189246","contract_type":"Design Build","initiatives":"['Accessibility']","budget_status":"1","schedule_status":"1","start_date":"2024-10-01T00:00:00.000","goal_completion_date":"2027-05-23T00:00:00.000","estimated_actual_completion_date":"2027-05-23T00:00:00.000","goal_project_cost":"159675688","estimated_actual_project_cost":"160483243"},
{":id":"row-cuzr~ckzn-tqzh",":version":"rv-7yjw.3fqi-sdaq",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12085","title":"Moodna/Woodbury Viaduct Repairs","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Metro-North Railroad']","asset_categories":"['Track & Structures']","description":"Metro-North structures need targeted renewal to remain safe and reliable. This project repairs the Moodna and Woodbury viaducts.","services":"['MNR-4']","capital_plans":"['8']","contract_type":"Design Build","initiatives":"['Safety']"},
{":id":"row-xbgn_f3sh-2mpj",":version":"rv-866p-eekh-98rd",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12145","title":"Train Wash Replacement","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Long Island Rail Road']","asset_categories":"['Shops And Yards']","description":"Railcar washers are critical to fleet cleanliness and maintenance throughput. This project replaces an existing train wash facility.","capital_plans":"['8']","contract_type":"DBB (A+B)"},
{":id":"row-rdi5_nu9v.s7g9",":version":"rv-ynhi-4ieb.exc7",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12150","title":"Yard Lighting & Amenities","stage":"Construction","phase":"Construction","agencies":"['Long Island Rail Road']","asset_categories":"['Shops & Yards']","description":"This project replaces the lighting at Hillside Support Facility with more modern, energy efficient LED systems.","capital_plans":"['8']","contract_number":"Contract 6536","budget_status":"1","schedule_status":"1","start_date":"2026-03-01T00:00:00.000","goal_completion_date":"2026-12-25T00:00:00.000","estimated_actual_completion_date":"2026-12-25T00:00:00.000","goal_project_cost":"9350000","estimated_actual_project_cost":"9350000"},
{":id":"row-fahx~q9k8-3qum",":version":"rv-esf6.idip-f6rz",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12197","title":"NYCT ADA: Package 1","stage":"Complete","phase":"Complete","agencies":"['Staten Island Railway', 'New York City Transit']","asset_categories":"['Staten Island Railway', 'Passenger Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we delivered 17 new elevators across eight stations—7 Av (Brooklyn), Grand St (L), Metropolitan Av (G), Lorimer St (L), E 149 St (Bronx), Dyckman St (1), Beach 67 St (A), and New Dorp (SIR). The work created street-to-platform accessible paths and included platform, fare control, and communications upgrades.","services":"['NYCT-L', 'NYCT-A', 'NYCT-F', 'NYCT-G', 'NYCT-1', 'NYCT-6', 'NYCT-SIR']","capital_plans":"['8', '9']","districts":"['CO-047', 'CO-081', 'CO-061', 'CO-005', 'CO-085']","prime_contractor":"JUDLAU CONTRACTING, INC.","contract_number":"A37151","contract_type":"Design Build","initiatives":"['Accessibility']","budget_status":"0","schedule_status":"3","start_date":"2020-12-01T00:00:00.000","goal_completion_date":"2023-08-31T00:00:00.000","estimated_actual_completion_date":"2024-04-30T00:00:00.000","goal_project_cost":"595277507","estimated_actual_project_cost":"324811569"},
{":id":"row-t44a~654j.kn2g",":version":"rv-ctt8.dew2.4zfz",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12224","title":"Morris Park Yard Drainage Improvements","stage":"Construction","phase":"Construction","agencies":"['Long Island Rail Road']","asset_categories":"['Shops And Yards']","description":"This project improves drainage and surfaces at the LIRR Morris Park Yard entrance and storage areas to improve site conditions, circulation, and stormwater performance.","capital_plans":"['8']","prime_contractor":"MADHU CONSTRUCTION CORPORATION","contract_number":"6506","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2026-12-15T00:00:00.000","estimated_actual_completion_date":"2026-12-15T00:00:00.000","goal_project_cost":"4959126","estimated_actual_project_cost":"4966835"},
{":id":"row-ibag_jjj2_dhfc",":version":"rv-vach~yv4q~gc7n",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12338","title":"NYCT ADA: Package 2","stage":"Complete","phase":"Complete","agencies":"['New York City Transit']","asset_categories":"['Track', 'Passenger Stations']","description":"We made six stations newly accessible—Westchester Sq–E Tremont Av, 181 St, Queensboro Plaza, 8 Av, Court Sq, and Woodhaven Blvd—and replaced elevators at Marcy Av and Flushing Av. The package delivered 11 new elevators, five replacements, ADA fare gates, platform-edge/tactile upgrades, and state-of-good-repair work.","services":"['NYCT-N', 'NYCT-J', 'NYCT-Z', 'NYCT-A', 'NYCT-G', 'NYCT-6', 'NYCT-W', 'NYCT-7']","capital_plans":"['7', '8', '9', '6']","districts":"['CO-047', 'CO-081', 'CO-061', 'CO-005']","prime_contractor":"MLJTC2","contract_number":"A37135","contract_type":"Design Build","initiatives":"['Accessibility']","budget_status":"0","schedule_status":"3","start_date":"2021-12-01T00:00:00.000","goal_completion_date":"2024-01-31T00:00:00.000","estimated_actual_completion_date":"2024-12-31T00:00:00.000","goal_project_cost":"456746154","estimated_actual_project_cost":"454928045"},
{":id":"row-h4e9_qv7p_yxjd",":version":"rv-wgd7~g55t_hp2v",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12404","title":"Electronic Security System: 1 Station Complex, Manhattan","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Signals & Communications']","description":"This project upgrades electronic security systems at a station complex in Manhattan to support safer operations and improved incident response.","capital_plans":"['9']","contract_number":"C52167","contract_type":"DBB (A+B)"},
{":id":"row-6bq8_dpb8~tsd9",":version":"rv-b6a9-diiw~3tvs",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12411","title":"NYCT ADA Station Improvements: Package 4","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making the Bay Ridge-95 St R, 137 St City College 1, Northern Blvd MR, and Parkchester 6 subway stations accessible and improving the station environment. This project will make all four stations newly accessible with new elevators, wider staircases, and new ADA-compliant boarding areas, in addition to making critical state of good repair improvements.","services":"['NYCT-R', 'NYCT-M', 'NYCT-1', 'NYCT-6']","capital_plans":"['7', '8', '9']","districts":"['CO-005', 'CO-047', 'CO-081', 'CO-061']","prime_contractor":"JT TC JOINT VENTURE","contract_number":"A37139","contract_type":"Design Build","initiatives":"['Accessibility']","budget_status":"0","schedule_status":"3","start_date":"2022-12-01T00:00:00.000","goal_completion_date":"2025-06-16T00:00:00.000","estimated_actual_completion_date":"2026-09-30T00:00:00.000","goal_project_cost":"229059322","estimated_actual_project_cost":"221614651"},
{":id":"row-vx56~fxzy_rbqb",":version":"rv-af7x.75c4_r929",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12420","title":"NYCT ADA Station Improvements: Package 3","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making accessibility improvements at 13 stations. This project includes eight stations being made newly accessible and five stations receiving elevator replacements with more modern, reliable units. We are also making structural, architectural, and electrical improvements that make way for these new elements and allow them to function safely and reliably.","services":"['NYCT-B', 'NYCT-Q', 'NYCT-L', 'NYCT-A', 'NYCT-F', 'NYCT-M', 'NYCT-R', 'NYCT-3', 'NYCT-4']","capital_plans":"['8', '9']","districts":"['CO-047', 'CO-081', 'CO-005', 'CO-061']","prime_contractor":"ELEVATED ACCESSIBILITY ENHANCEMENTS","contract_number":"A37140","contract_type":"Design Build","initiatives":"['Accessibility']","budget_status":"1","schedule_status":"3","start_date":"2022-12-01T00:00:00.000","goal_completion_date":"2026-06-30T00:00:00.000","estimated_actual_completion_date":"2026-12-31T00:00:00.000","goal_project_cost":"664470802","estimated_actual_project_cost":"664470802"},
{":id":"row-mpjp-ajs2.3pkb",":version":"rv-beh4-925g_22p6",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12505","title":"SIR Stations and Structures Program (2020-24)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Staten Island Railway']","asset_categories":"['Staten Island Railway']","description":"This program invests in the structural rehabilitation at the Garretson Ave Bridge and Stapleton Viaduct along with station component repairs at Staten Island Railway stations.","services":"['NYCT-SIR']","capital_plans":"['8', '9']","districts":"['CO-085']","contract_type":"DBB (A+B)","initiatives":"['Safety','Enabled by Congestion Relief']","schedule_status":"1","start_date":"2026-04-01T00:00:00.000","goal_completion_date":"2029-06-01T00:00:00.000","estimated_actual_completion_date":"2029-06-01T00:00:00.000","estimated_actual_project_cost":"128410776"},
{":id":"row-arqh.zw2m~q84a",":version":"rv-huk5.9pde_2y77",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12553","title":"DOS Facility Heating and Energy Efficiency Boiler Upgrades","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Shops & Yards']","description":"This project upgrades boilers and related systems at Department of Subways facilities to improve heating reliability and energy efficiency.","capital_plans":"['8']","prime_contractor":"FOS-WE JV LLC","contract_number":"E35334","contract_type":"DBB (A+B)","budget_status":"1","schedule_status":"1","start_date":"2025-09-01T00:00:00.000","goal_completion_date":"2027-03-31T00:00:00.000","estimated_actual_completion_date":"2027-03-31T00:00:00.000","goal_project_cost":"30498035","estimated_actual_project_cost":"30498035"},
{":id":"row-yzg6_g25s-djiv",":version":"rv-zecu~p9vp~we7b",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12630","title":"NYCT ADA Station Improvements: Package 5","stage":"Construction","phase":"Construction","agencies":"['Staten Island Railway', 'New York City Transit']","asset_categories":"['Staten Island Railway', 'Track', 'Passenger Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making 13 stations accessible. This project will add new elevators or ADA accessible ramps to stations across New York City. In addition, we are making structural improvements to the stations, improving electrical and communications equipment, and restoring adjacent streets and sidewalks.","services":"['NYCT-N', 'NYCT-W', 'NYCT-D', 'NYCT-R', 'NYCT-B', 'NYCT-C', 'NYCT-E', 'NYCT-M', 'NYCT-G', 'NYCT-1', 'NYCT-3', 'NYCT-4', 'NYCT-5', 'NYCT-6', 'NYCT-7', 'NYCT-SIR']","capital_plans":"['8', '9']","districts":"['CO-081', 'CO-047', 'CO-061', 'CO-005', 'CO-085']","prime_contractor":"JUDLAU CONTRACTING, INC.","contract_number":"A37758","contract_type":"Design Build","initiatives":"['Accessibility']","budget_status":"1","schedule_status":"3","start_date":"2023-12-01T00:00:00.000","goal_completion_date":"2026-12-23T00:00:00.000","estimated_actual_completion_date":"2027-12-31T00:00:00.000","goal_project_cost":"854310538","estimated_actual_project_cost":"854310538"},
{":id":"row-f3a5~zk49~8p2d",":version":"rv-h459-fcuc_9pjr",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12632","title":"ADA / Station Renewals: Brook Av & 3 Av-138 St / PEL","stage":"Procurement","phase":"Active Procurement","agencies":"['New York City Transit']","asset_categories":"['Track', 'Passenger Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making 3 Av–138 St and Brook Av (6) accessible and renewing both stations with new ADA boarding areas, upgraded platform edges, new lighting, and improvements to other station infrastructure.","services":"['NYCT-6']","capital_plans":"['8', '9']","districts":"['CO-005']","contract_type":"Design Build","initiatives":"['Accessibility','Enabled by Congestion Relief']"},
{":id":"row-8tsd~iv2b_zt8x",":version":"rv-djd6.6ttj-8h4x",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12648","title":"LIRR ADA Station Improvements: Package 1","stage":"Complete","phase":"Complete","agencies":"['Long Island Rail Road']","asset_categories":"['Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making improvements at 9 LIRR stations. This project includes making 7 stations newly accessible and replacing elevators and escalators at 2 additional stations. In addition to adding new elevators and their supporting infrastructure, we will repair platforms and canopies, add new lighting, and replace digital customer communications systems, among other structural improvements.","capital_plans":"['8']","districts":"['CO-103', 'CO-059']","prime_contractor":"CITNALTA-SCALAMANDRE JV","contract_number":"6478","contract_type":"Design Build","initiatives":"['Accessibility']","budget_status":"1","schedule_status":"3","start_date":"2022-12-01T00:00:00.000","goal_completion_date":"2025-09-15T00:00:00.000","estimated_actual_completion_date":"2025-12-31T00:00:00.000","goal_project_cost":"167726921","estimated_actual_project_cost":"169322189"},
{":id":"row-3r4s~abke.934g",":version":"rv-xukt.udms_thp8",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12654","title":"LIRR ADA Station Improvements: Package 2","stage":"Construction","phase":"Construction","agencies":"['Long Island Rail Road']","asset_categories":"['Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making improvements at the Forest Hills, Hollis, and Babylon LIRR stations. In addition to making these stations fully accessible, we are undertaking a major station renovation at Babylon and state of good repair improvements at Forest Hills and Hollis.","capital_plans":"['8']","districts":"['CO-103', 'CO-059']","prime_contractor":"FORTE CONSTRUCTION CORP","contract_number":"6494","contract_type":"Design Build","initiatives":"['Accessibility','Enabled by Congestion Relief']","budget_status":"1","schedule_status":"0","start_date":"2023-12-01T00:00:00.000","goal_completion_date":"2027-12-15T00:00:00.000","estimated_actual_completion_date":"2027-11-08T00:00:00.000","goal_project_cost":"326865721","estimated_actual_project_cost":"328194829"},
{":id":"row-xu78.knca~yx7m",":version":"rv-mqzc.cb9x~f8kp",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12677","title":"Fan Plant Component Repairs","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Line Equipment']","description":"Ventilation plants support smoke control and emergency operations. This project repairs components at one or more fan plants. Exact locations to be announced on Solicitation Notice.","services":"['NYCT-4', 'NYCT-5', 'NYCT-6', 'NYCT-A', 'NYCT-B', 'NYCT-C', 'NYCT-D', 'NYCT-F', 'NYCT-G', 'NYCT-J', 'NYCT-M', 'NYCT-Z']","capital_plans":"['8', '9']","districts":"['CO-061', 'CO-047']","contract_number":"E31634","contract_type":"DBB (A+B)","initiatives":"['Safety','Enabled by Congestion Relief']"},
{":id":"row-qrx6~ppzz-jcr5",":version":"rv-ny72~nqun-ybhe",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12695","title":"HVAC Upgrade at Herald Sq Track Employee Facility","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Misc/Emergency']","description":"Employee facilities require reliable climate control for safe, continuous operations. This project upgrades HVAC at the Herald Sq track employee facility.","capital_plans":"['8']","districts":"['CO-061']","contract_type":"DBB (SBMP)","initiatives":"['Safety']"},
{":id":"row-gccg~6buf-wq74",":version":"rv-dkix-7vnz.bk2s",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12719","title":"Depot Boilers, HVAC & Misc: Kingsbridge, Flatbush,Charleston","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Depots']","description":"We’re upgrading three NYC Transit bus depots—Kingsbridge, Flatbush, and Charleston—to improve safety and reliability.","services":"['NYCT-BK', 'NYCT-BX', 'NYCT-SI']","capital_plans":"['8', '9']","districts":"['CO-047', 'CO-061', 'CO-085']","prime_contractor":"WELKIN MECHANICAL LLC","contract_number":"C40299","contract_type":"DBB (A+B)","initiatives":"['Sustainability','Enabled by Congestion Relief']","budget_status":"1","schedule_status":"0","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2028-04-30T00:00:00.000","estimated_actual_completion_date":"2027-11-17T00:00:00.000","goal_project_cost":"98558590","estimated_actual_project_cost":"98823590"},
{":id":"row-paw5.ri7i~k67q",":version":"rv-mxyt_qxmz_chu5",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12721","title":"Rehabilitation of 5 CBHs - Various Locations","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Traction Power']","description":"Power distribution equipment supports safe, reliable train service. This project rehabilitates circuit breaker houses at multiple locations to replace aging equipment and improve system reliability.","capital_plans":"['8', '9']","prime_contractor":"TAP ELECTRICAL CONTRACTING SERVICE INC","contract_number":"P36509","contract_type":"DBB (A+B)","budget_status":"1","schedule_status":"0","start_date":"2025-10-01T00:00:00.000","goal_completion_date":"2028-08-01T00:00:00.000","estimated_actual_completion_date":"2027-12-01T00:00:00.000","goal_project_cost":"55958246","estimated_actual_project_cost":"55958246"},
{":id":"row-49pf_vtnz-dd6h",":version":"rv-6ict-9ajt-a87t",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12727","title":"Structural Painting and Repair: Queensboro Plaza - 33 St / Flushing Line","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Line Structures']","description":"This project performs structural repairs and painting on the Flushing Line between Queensboro Plaza and 33 St.","capital_plans":"['8', '9']","contract_number":"C35310","contract_type":"DBB (A+B)"},
{":id":"row-r2cb~y57f~jpna",":version":"rv-5egs_evf8-5z7q",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12729","title":"Car Washer Component Repairs","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Shops & Yards']","description":"Keeping car washers in good condition supports fleet availability and cleanliness. This project repairs components of an existing car washer.","capital_plans":"['8', '9']","prime_contractor":"C A C INDUSTRIES INC.","contract_number":"C33943","contract_type":"DBB (A+B)","initiatives":"['Reliability','Enabled by Congestion Relief']","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2028-05-24T00:00:00.000","estimated_actual_completion_date":"2028-05-24T00:00:00.000","goal_project_cost":"110091119","estimated_actual_project_cost":"110091119"},
{":id":"row-vpy5.gtq9~6tuk",":version":"rv-ey9g.aemm.8bbm",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12735","title":"Laser Intrusion Detection System (LIDS)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"Perimeter detection and security systems protect subway tracks from unauthorized intrusion. This project installs or upgrades a Laser Intrusion Detection System at stations throughout the system.","services":"['NYCT-R', 'NYCT-W', 'NYCT-N', 'NYCT-Q', 'NYCT-D', 'NYCT-B', 'NYCT-J', 'NYCT-Z', 'NYCT-L', 'NYCT-A', 'NYCT-C', 'NYCT-E', 'NYCT-F', 'NYCT-M', 'NYCT-1', 'NYCT-2', 'NYCT-3', 'NYCT-4', 'NYCT-5', 'NYCT-6']","capital_plans":"['8']","districts":"['CO-061', 'CO-047']","initiatives":"['Signal Modernization', 'Reliability']"},
{":id":"row-kiet~4dn2_g3gm",":version":"rv-xs5c-rina_z2jw",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12736","title":"Track Intrusion Detection Prototype","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"This project includes installation of track intrusion detection systems at select subway stations to help identify unauthorized access to the right-of-way and support safer operations.","capital_plans":"['8']","contract_type":"Design Build"},
{":id":"row-uxr8-47vm-mkx7",":version":"rv-etj6-gm3r~3cha",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12750","title":"NYCT ADA Station Improvements: Package 6","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Track', 'Passenger Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making five stations accessible—Norwood Av (J/Z), Myrtle Av (J/M/Z), Avenue I (F), Burnside Av (4), and Middletown Rd (6)—and improving the station environment. This package adds new elevators and accessible paths, upgrades stairs and fare payment areas, and delivers state of good repair work like platform and structural fixes so these stations are safer, more reliable, and easier to use for everyone.","services":"['NYCT-J', 'NYCT-Z', 'NYCT-M', 'NYCT-F', 'NYCT-6', 'NYCT-4']","capital_plans":"['8', '9']","districts":"['CO-047', 'CO-005']","prime_contractor":"MLJTC2","contract_number":"A37806","contract_type":"Design Build","initiatives":"['Accessibility']","budget_status":"1","schedule_status":"0","start_date":"2024-12-01T00:00:00.000","goal_completion_date":"2028-11-11T00:00:00.000","estimated_actual_completion_date":"2028-10-11T00:00:00.000","goal_project_cost":"426201510","estimated_actual_project_cost":"437035410"},
{":id":"row-et3b~8abj-bqe9",":version":"rv-cx6h.38pe_t6c5",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12751","title":"NYCT ADA: Package 7","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Track', 'Passenger Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making the 167 St B/D and Kingsbridge Rd 4 stations accessible. This project will add new elevators, relocate staircases, and create new ADA-compliant boarding areas. In addition, we are making structural improvements to the stations, improving electrical and communications equipment, and restoring adjacent streets and sidewalks.","services":"['NYCT-4', 'NYCT-B', 'NYCT-D']","capital_plans":"['8', '9']","districts":"['CO-005']","prime_contractor":"FORTE CONSTRUCTION CORP","contract_number":"A37811","contract_type":"Design Build","initiatives":"['Accessibility','Enabled by Congestion Relief']","budget_status":"1","schedule_status":"1","start_date":"2025-11-01T00:00:00.000","goal_completion_date":"2028-08-03T00:00:00.000","estimated_actual_completion_date":"2028-08-03T00:00:00.000","goal_project_cost":"179622991","estimated_actual_project_cost":"179622991"},
{":id":"row-cqjf.npe2.22vr",":version":"rv-5rau_69iv_wdmn",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12752","title":"Design-Build Services for ADA Upgrades Package 8","stage":"Procurement","phase":"Active Procurement","agencies":"['New York City Transit']","asset_categories":"['Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making five stations accessible - 18 Av (D), Fort Hamilton Pkwy (D), Jefferson St (L), Neptune Av (F), and Nostrand Av (A,C).","initiatives":"['Accessibility']"},
{":id":"row-7w6n_anqv.b6b9",":version":"rv-uua2-v726-esqm",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12753","title":"NYCT ADA Station Improvements: Package 9","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making the Parsons Blvd F, Briarwood E/F, and Gates Av J/Z subway stations accessible and improving the station environment. This project will make all three stations newly accessible with new elevators, wider staircases, and new ADA-compliant boarding areas, in addition to making critical state of good repair improvements.","services":"['NYCT-J', 'NYCT-Z', 'NYCT-F', 'NYCT-E']","capital_plans":"['8', '9']","districts":"['CO-047', 'CO-081']","prime_contractor":"FORTE CONSTRUCTION CORP","contract_number":"A37824","contract_type":"Design Build","initiatives":"['Accessibility','Enabled by Congestion Relief']","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2028-12-30T00:00:00.000","estimated_actual_completion_date":"2028-12-30T00:00:00.000","goal_project_cost":"273547648","estimated_actual_project_cost":"273547648"},
{":id":"row-q5yc.fst6-ivaf",":version":"rv-mupy-mqrp~gdpg",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12754","title":"Design-Build Services for ADA Upgrades - Package 10","stage":"Procurement","phase":"Active Procurement","agencies":"['New York City Transit']","asset_categories":"['Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making three stations accessible - 2 Av (F), 7 Av (B,D,E), and Morrison Av-Soundview (6).","initiatives":"['Accessibility']"},
{":id":"row-dm9x-b92v_c8sd",":version":"rv-9frg.8ieu.b6jn",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12788","title":"1 Subway Street Stair: Grand AV/QBL (S2) [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project repairs or replaces one subway street stair at Grand Av on the Queens Blvd Line to improve safety and station access. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8']","prime_contractor":"SHINING SKY INC","contract_number":"A37780","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-08-01T00:00:00.000","goal_completion_date":"2026-05-26T00:00:00.000","estimated_actual_completion_date":"2026-05-26T00:00:00.000","goal_project_cost":"778250","estimated_actual_project_cost":"778250"},
{":id":"row-4gq7_amhi~ps5d",":version":"rv-dups_6dkh-mbvg",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12802","title":"Station Renewals: 3 Locations (6AV, PEL, QBL)","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Track', 'Passenger Stations']","description":"This project delivers station improvements at the 7th Ave BQ, E 149th St 6, and 179th St F stations, including component repairs, water leak mitigation, and other improvements to the station environment.","capital_plans":"['8', '9']","prime_contractor":"FORTE CONSTRUCTION CORP","contract_number":"A46042","contract_type":"TBD","budget_status":"1","schedule_status":"1","start_date":"2025-11-01T00:00:00.000","goal_completion_date":"2028-01-10T00:00:00.000","estimated_actual_completion_date":"2028-01-10T00:00:00.000","goal_project_cost":"171560891","estimated_actual_project_cost":"171560891"},
{":id":"row-8vrf_xux9.i8kt",":version":"rv-qv6p.dab3_pt2n",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12880","title":"Passenger ID CCTV: Christopher St & Houston St / BW7 [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"This project upgrades communications and security systems at Christopher St and Houston St stations. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8']","prime_contractor":"MCT AT SERVICE INC","contract_number":"C52191","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-02-01T00:00:00.000","goal_completion_date":"2026-04-30T00:00:00.000","estimated_actual_completion_date":"2026-04-29T00:00:00.000","goal_project_cost":"1876518","estimated_actual_project_cost":"1876518"},
{":id":"row-9ny9-gma3_xxgh",":version":"rv-igp2_q6s3_2nyp",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12882","title":"Passenger ID CCTV: Canal St & Franklin St / BW7 [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"This project upgrades communications and security systems at the Canal St and Franklin St stations to support safety and incident response. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8']","prime_contractor":"MCT AT SERVICE INC","contract_number":"C52192","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"2","start_date":"2025-02-01T00:00:00.000","goal_completion_date":"2026-04-30T00:00:00.000","estimated_actual_completion_date":"2026-06-05T00:00:00.000","goal_project_cost":"1634654","estimated_actual_project_cost":"1634654"},
{":id":"row-7hdr_ce2v-rcnk",":version":"rv-9m2w.fs2x-xmc6",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"12903","title":"Install Bike Racks/Hastings Sidewalk Repair","stage":"Construction","phase":"Construction","agencies":"['Metro-North Railroad']","asset_categories":"['Stations']","description":"This project installs new bike racks to support first/last-mile access for the community, repairs a portion of the pedestrian sidewalk, and improves the access path at Hastings-on-Hudson to better accommodate customers using wheelchairs.","capital_plans":"['8']","prime_contractor":"IN HOUSE GROUP INC","contract_number":"1000197600","contract_type":"DBB (SBMP)","budget_status":"2","schedule_status":"3","start_date":"2025-04-01T00:00:00.000","goal_completion_date":"2026-03-31T00:00:00.000","estimated_actual_completion_date":"2026-07-31T00:00:00.000","goal_project_cost":"1593779","estimated_actual_project_cost":"1698779"},
{":id":"row-9aiq_qmby.uwpt",":version":"rv-86xz~v8pd.w2qb",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13005","title":"215 St Signal Shop Component Replacement","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Misc/Emergency', 'Shops & Yards']","description":"Signal shops support systemwide signal reliability. This project replaces components at the 215 St signal shop.","capital_plans":"['9', '8']","contract_type":"DBB (A+B)","initiatives":"['Signal Modernization', 'Reliability','Enabled by Congestion Relief']"},
{":id":"row-6nbe_4y8p~pigy",":version":"rv-rx5v.ahwc_qzf3",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13040","title":"East New York Depot Fire Suppression System Rehabilitation","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Depots']","description":"This project rehabilitates and replaces aging fire suppression distribution piping at the East New York Bus Depot to improve overall reliability and performance of the system.","capital_plans":"['8']","prime_contractor":"RICHARDS PLUMBING & HEATING CO INC","contract_number":"C40903","contract_type":"DBB (A+B)","budget_status":"1","schedule_status":"1","start_date":"2025-08-01T00:00:00.000","goal_completion_date":"2026-09-16T00:00:00.000","estimated_actual_completion_date":"2026-09-16T00:00:00.000","goal_project_cost":"10392209","estimated_actual_project_cost":"10392209"},
{":id":"row-ce99.jgtu_t8js",":version":"rv-hmkt-swju-vrjc",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13057","title":"Facade Repair: 4 Av Station / 6 Av Line","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project rehabilitates facade elements at 4 Av Station on the 6 Av Line in Brooklyn.","capital_plans":"['8']","contract_number":"A35355","contract_type":"DBB (A+B)"},
{":id":"row-q73b_t75f-hn7r",":version":"rv-knje-ys6z-qe7v",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13062","title":"Michael J. Quill Bus Depot: Expansion Joint, Beam, and Slab Repairs","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Depots']","description":"This project repairs structural components at the Michael J. Quill Bus Depot.","capital_plans":"['8']","contract_type":"DBB (A+B)"},
{":id":"row-dghg.razg.chf5",":version":"rv-qma8~hct6-9u48",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13075","title":"Purchase 378 New B-Division Cars (R268)","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Subway Cars']","description":"This project purchases new R268 subway cars for the B Division to modernize the fleet and improve reliability and the customer experience.","capital_plans":"['9']","prime_contractor":"KAWASAKI RAIL CAR INC","contract_number":"R34268","contract_type":"Purchase (RFP)","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2030-07-31T00:00:00.000","estimated_actual_completion_date":"2030-07-31T00:00:00.000","goal_project_cost":"1629384801","estimated_actual_project_cost":"1629384801"},
{":id":"row-knzd_a43i-h4ry",":version":"rv-bfer-urq8-cjet",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13095","title":"CBTC Canarsie Upgrade","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Signals & Communications']","description":"This project provides upgrades to the Canarsie Line CBTC system that will further improve reliability and support more consistent service.","capital_plans":"['9']","contract_type":"TBD"},
{":id":"row-7366.nett~jqsn",":version":"rv-b9sb-h63y-tsx7",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13106","title":"SAS Ph2: Heavy Civil TBM 116 St / 125 St Stns: Contract 2","stage":"Construction","phase":"Construction","agencies":"['MTA Capital Construction Company']","asset_categories":"['Full Length Second Ave Subway']","description":"As part of the overall Second Ave Subway Phase 2 project, this contract advances tunnel construction and related structural work near future 116 St and 125 St station areas.","capital_plans":"['8']","prime_contractor":"CONNECT PLUS PARTNERS","contract_number":"C26202","contract_type":"Design Build","budget_status":"1","schedule_status":"1","start_date":"2025-08-01T00:00:00.000","goal_completion_date":"2029-09-07T00:00:00.000","estimated_actual_completion_date":"2029-09-11T00:00:00.000","goal_project_cost":"2120219209","estimated_actual_project_cost":"2120219209"},
{":id":"row-vash-tx9f~hvrw",":version":"rv-n6xd~xyz9-2crn",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13118","title":"Signal Tower n/o Parkchester / PEL","stage":"Complete","phase":"Complete","agencies":"['New York City Transit']","asset_categories":"['Line Structures']","description":"This project removes an obsolete signal tower structure near Parkchester to support safe, maintainable right-of-way conditions.","capital_plans":"['8']","prime_contractor":"GRAMERCY PJS JV","contract_number":"A35305","contract_type":"Change Order","budget_status":"1","schedule_status":"1","start_date":"2025-10-01T00:00:00.000","goal_completion_date":"2025-12-31T00:00:00.000","estimated_actual_completion_date":"2025-12-31T00:00:00.000","goal_project_cost":"2521628","estimated_actual_project_cost":"2521628"},
{":id":"row-9nbc~2kvc-xf9d",":version":"rv-hd8f_m8i7.c778",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13156","title":"South Shore Bridge Painting","stage":"Construction","phase":"Construction","agencies":"['Long Island Rail Road']","asset_categories":"['Line Structures']","description":"This project rehabilitates and repaints multiple LIRR bridges to protect structural steel from corrosion and extend service life.","capital_plans":"['8']","prime_contractor":"CHAMPION PAINTING SPECIALITY SVS CORP","contract_number":"6524","contract_type":"DBB (A+B)","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2027-05-15T00:00:00.000","estimated_actual_completion_date":"2027-05-15T00:00:00.000","goal_project_cost":"16501251","estimated_actual_project_cost":"16501251"},
{":id":"row-7y5m-5qyu-iwzu",":version":"rv-rf29-8bga.8s4m",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13163","title":"VNB Main Cable Dehumidification System -Ph1","stage":"Construction","phase":"Construction","agencies":"['Bridges And Tunnels']","asset_categories":"['Structures']","description":"This project installs a dehumidification system for the Verrazzano-Narrows Bridge main cables to reduce corrosion and extend the life of these critical structural elements.","capital_plans":"['8']","prime_contractor":"SKANSKA KOCH  INC.","contract_number":"VN-8Q","contract_type":"Design Build","budget_status":"0","schedule_status":"1","start_date":"2025-07-01T00:00:00.000","goal_completion_date":"2029-08-02T00:00:00.000","estimated_actual_completion_date":"2029-08-31T00:00:00.000","goal_project_cost":"320930615","estimated_actual_project_cost":"320749498"},
{":id":"row-mrr5-pmqh-vgvf",":version":"rv-e9z2-k4qh.xpvk",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13193","title":"Atlantic Terminal Ticket Office HVAC","stage":"Construction","phase":"Construction","agencies":"['Long Island Rail Road']","asset_categories":"['Shops And Yards']","description":"This project replaces and upgrades HVAC systems serving the LIRR Atlantic Terminal ticket office and adjacent customer and staff areas to improve comfort and reliability.","capital_plans":"['8']","prime_contractor":"CAPRY GROUP INC","contract_number":"6493RR","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"0","start_date":"2025-01-01T00:00:00.000","goal_completion_date":"2027-06-15T00:00:00.000","estimated_actual_completion_date":"2026-08-15T00:00:00.000","goal_project_cost":"4964660","estimated_actual_project_cost":"4964660"},
{":id":"row-7jqg~4nxc.vhn6",":version":"rv-ugvd-nm78.ybdq",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13218","title":"Purchase 21 Articulated Buses","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Buses']","description":"This project purchases 21 articulated buses for New York City Transit to replace buses that have reached the end of their useful life and support more reliable service on high-ridership routes.","capital_plans":"['9']","contract_number":"B40737","contract_type":"Purchase (RFP)","budget_status":"1","schedule_status":"0","start_date":"2025-06-01T00:00:00.000","goal_completion_date":"2028-06-30T00:00:00.000","estimated_actual_completion_date":"2028-02-28T00:00:00.000","goal_project_cost":"31013625","estimated_actual_project_cost":"31013625"},
{":id":"row-v9wj.afs9.yp65",":version":"rv-vecw~f67q_98at",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13249","title":"1 Sub Street Stair: Vernon-Jackson / FLS (S2/M5/M2AB)[SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project repairs one subway street stair at Vernon Blvd-Jackson Av on the Flushing Line to improve safety and station access. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8']","prime_contractor":"HIGH POINT CONSTRUCTION GROUP CORP","contract_number":"A37842","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-07-01T00:00:00.000","goal_completion_date":"2026-04-24T00:00:00.000","estimated_actual_completion_date":"2026-04-24T00:00:00.000","goal_project_cost":"802525","estimated_actual_project_cost":"802525"},
{":id":"row-g5a2_y337_rdps",":version":"rv-zqqy_6gtt_8x3x",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13263","title":"3 Subway Interior Stairs: Elmhurst Av / QBL (P3,P4,P5)[SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project repairs or replaces three interior stairs at Elmhurst Av on the Queens Blvd Line to improve circulation and station safety. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8']","prime_contractor":"MAK -TECH CONSTRUCTION INC.","contract_number":"A37859","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-08-01T00:00:00.000","goal_completion_date":"2026-11-13T00:00:00.000","estimated_actual_completion_date":"2026-11-13T00:00:00.000","goal_project_cost":"1342314","estimated_actual_project_cost":"1342314"},
{":id":"row-zyip.g3cm-v3e4",":version":"rv-twxr_66jg_jvnv",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13273","title":"Brooklyn Bridge - City Hall / LEX (Vents and Mezz Ceiling)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project addresses station vents and mezzanine ceiling work at Brooklyn Bridge–City Hall on the Lexington Ave line.","services":"['NYCT-4', 'NYCT-5', 'NYCT-6']","capital_plans":"['8', '9']","districts":"['CO-061']","contract_number":"A37860","contract_type":"DBB (A+B)"},
{":id":"row-85jj.4a8r-p7h4",":version":"rv-7suj~ifw9-85fx",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13281","title":"HVAC/Sanitary Sewer Connections","stage":"Construction","phase":"Construction","agencies":"['Long Island Rail Road']","asset_categories":"['Stations']","description":"This project replaces HVAC equipment at the Hicksville and Ronkonkoma stations and improves sewer connections at Ronkonkoma to support station operations and customer comfort.","capital_plans":"['8']","prime_contractor":"SPENCER CONTRACTING LLC","contract_number":"6526","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"0","start_date":"2025-08-01T00:00:00.000","goal_completion_date":"2026-11-08T00:00:00.000","estimated_actual_completion_date":"2026-10-30T00:00:00.000","goal_project_cost":"3988988","estimated_actual_project_cost":"3988988"},
{":id":"row-5daj~s5nq_523s",":version":"rv-qhyw~67td_7fan",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13286","title":"W255th St Reconstruction @ Riverdale","stage":"Construction","phase":"Construction","agencies":"['Metro-North Railroad']","asset_categories":"['Stations']","description":"This project improves pedestrian access and circulation near the Metro-North Riverdale Station.","capital_plans":"['8']","prime_contractor":"PENCOL CONTRACTING CORP","contract_number":"1000200406","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2026-09-30T00:00:00.000","estimated_actual_completion_date":"2026-09-30T00:00:00.000","goal_project_cost":"3315924","estimated_actual_project_cost":"3315924"},
{":id":"row-pqws.6ymf.64bk",":version":"rv-wzhh-jkka~d4fq",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13287","title":"Fleetwood Circulation Improvements","stage":"Construction","phase":"Construction","agencies":"['Metro-North Railroad']","asset_categories":"['Stations']","description":"This project improves circulation, adds ADA-comppliant markings, and rehabilitates parking areas at the Fleetwood station to make it easier for all riders to access the station.","capital_plans":"['8']","prime_contractor":"SPENCER CONTRACTING LLC","contract_number":"1000200405","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-07-01T00:00:00.000","goal_completion_date":"2026-04-30T00:00:00.000","estimated_actual_completion_date":"2026-04-17T00:00:00.000","goal_project_cost":"1611718","estimated_actual_project_cost":"1611718"},
{":id":"row-z7gt_2uu8.n59x",":version":"rv-cijz_kx3g-vevz",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13326","title":"Hudson Line Slope Stabilization","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Metro-North Railroad']","asset_categories":"['Track & Structures']","description":"The stabilization project is focused on the Hudson Line in Yonkers. The project includes drainage and culvert improvements, slope stabilization, and retaining wall rehabilitation. This project is part of the larger Hudson Line resiliency efforts.","capital_plans":"['8']","contract_type":"Design Build","initiatives":"['Resilience']"},
{":id":"row-5ku6-h5uc.tiiy",":version":"rv-4isa_55fq-i6cv",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13331","title":"Passenger ID CCTV: Beach 90 St / RKY [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"This project upgrades communications and security systems at Beach 90 St on the Rockaway Line to support safety and incident response. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8', '9']","prime_contractor":"CITY GRID ELECTRIC CORP","contract_number":"C52188","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"2","start_date":"2025-03-01T00:00:00.000","goal_completion_date":"2026-03-10T00:00:00.000","estimated_actual_completion_date":"2026-05-26T00:00:00.000","goal_project_cost":"1178100","estimated_actual_project_cost":"1178100"},
{":id":"row-r3cc-nm7z_4dcn",":version":"rv-k2df_9wue~4644",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13337","title":"1 Subway Street Stair: 207 St / 8AV (S4/M5 A/B) [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project repairs or replaces one subway street stair at 207 St on the 8 Av Line to improve safety and station access. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8', '9']","prime_contractor":"TDP ASSOCIATES INC","contract_number":"A37838","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-07-01T00:00:00.000","goal_completion_date":"2026-10-29T00:00:00.000","estimated_actual_completion_date":"2026-10-29T00:00:00.000","goal_project_cost":"2182600","estimated_actual_project_cost":"2182600"},
{":id":"row-gzny-tbxy_6ix2",":version":"rv-hn37~tkm9~8vtv",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13338","title":"2 Sub Street Stairs: 169 St / QBL (S1/M1AB, S3/M3AB) [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project repairs or replaces two subway street stairs at 169 St on the Queens Blvd Line to improve safety and station access. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8', '9']","prime_contractor":"REIS/AKAR RENOVATION INC","contract_number":"A37846","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-08-01T00:00:00.000","goal_completion_date":"2026-11-14T00:00:00.000","estimated_actual_completion_date":"2026-11-13T00:00:00.000","goal_project_cost":"2217843","estimated_actual_project_cost":"2257843"},
{":id":"row-tedt_qe86.x7h2",":version":"rv-ph5x.4ic2~pwr8",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13339","title":"2 Subway Street Stairs: 179 St / QBL (S2/M2AB, S4/M4) [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project repairs or replaces two subway street stairs at 179 St on the Queens Blvd Line to improve safety and station access. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8', '9']","prime_contractor":"CITY EVOLUTIONARY CONSTRUCTION LLC","contract_number":"A37847","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-07-01T00:00:00.000","goal_completion_date":"2026-12-27T00:00:00.000","estimated_actual_completion_date":"2026-12-27T00:00:00.000","goal_project_cost":"3293830","estimated_actual_project_cost":"3296873"},
{":id":"row-4urn~gr3b~fepj",":version":"rv-gdnw_n3bi~gnah",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13341","title":"1 Elevated Street Stair: Beach 44 St / FAR (S4AB-M4AB)[SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project repairs or replaces one elevated street stair at Beach 44 St on the Far Rockaway Line to improve safety and station access. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8', '9']","prime_contractor":"ON TOP RENOVATION INC","contract_number":"A37841","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"3","start_date":"2025-08-01T00:00:00.000","goal_completion_date":"2026-08-14T00:00:00.000","estimated_actual_completion_date":"2026-12-04T00:00:00.000","goal_project_cost":"2095976","estimated_actual_project_cost":"2095976"},
{":id":"row-jnkm_w7ms-5upp",":version":"rv-qdnz_rhkw_8am7",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13346","title":"Structural Testing Systemwide","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Line Structures']","description":"This project performs targeted structural testing at select elevated structures to help prioritize repairs and improve safety.","capital_plans":"['9']","contract_type":"DBB (IFB)"},
{":id":"row-zgsu.geiq-acdm",":version":"rv-bezv~axnq.zqse",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13370","title":"Rehabilitation of Emergency Exits: 21 Locations","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Line Structures']","description":"Emergency egress infrastructure must be maintained systemwide. This project rehabilitates emergency exits at 21 locations.","services":"['NYCT-4', 'NYCT-5', 'NYCT-6', 'NYCT-A', 'NYCT-B', 'NYCT-C', 'NYCT-D', 'NYCT-F', 'NYCT-J', 'NYCT-L', 'NYCT-N', 'NYCT-Q', 'NYCT-R', 'NYCT-W', 'NYCT-Z']","capital_plans":"['9']","districts":"['CO-061', 'CO-047', 'CO-005', 'CO-081']","contract_type":"In House","initiatives":"['Safety']"},
{":id":"row-7ez5~bhmc.sjgm",":version":"rv-4434~nvy5~zp57",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13371","title":"Equip B Div w/ 2nd CBTC Radio","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"This project advances the expansion of CBTC radio capability on B Division fleets, supporting signal modernization.","capital_plans":"['8']","contract_number":"S48021","contract_type":"Change Order","budget_status":"1","schedule_status":"1","start_date":"2025-09-01T00:00:00.000","goal_completion_date":"2027-04-30T00:00:00.000","estimated_actual_completion_date":"2027-04-30T00:00:00.000","goal_project_cost":"44934856","estimated_actual_project_cost":"44934856"},
{":id":"row-2tt2~xse6.dcti",":version":"rv-cgye~b4yw-sivr",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13372","title":"Equip B Division with Second CBTC Radio: Hitachi","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"Modern communications are essential for advanced train control. This project expands onboard CBTC radio capability on B Division fleets to support signal modernization and more reliable service.","capital_plans":"['8']","contract_number":"S48022","contract_type":"Change Order","budget_status":"1","schedule_status":"1","start_date":"2025-11-01T00:00:00.000","goal_completion_date":"2028-03-20T00:00:00.000","estimated_actual_completion_date":"2028-03-20T00:00:00.000","goal_project_cost":"85163704","estimated_actual_project_cost":"85163704"},
{":id":"row-c2iq-w7fd-47zq",":version":"rv-jxcx~vjiq.jhzj",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13385","title":"Elevated Structure Repairs: 9th Av Port to Stillwell Av/ WST","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Line Structures']","description":"This project performs structural repairs and painting from the 9th Ave portal to Stillwell Ave on the West End Line. This will provide protective coating that prevents corrosion and extends the service life of the structures.","capital_plans":"['8']","prime_contractor":"EMPIRE CONTROL ABATEMENT INC.","contract_number":"C35358","contract_type":"DBB (IFB)","budget_status":"0","schedule_status":"1","start_date":"2025-01-01T00:00:00.000","goal_completion_date":"2028-01-10T00:00:00.000","estimated_actual_completion_date":"2028-01-10T00:00:00.000","goal_project_cost":"67761544","estimated_actual_project_cost":"65334382"},
{":id":"row-e848-4467~bcvc",":version":"rv-5tsy.jdpi-drz7",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13408","title":"1 Subway Street Stair: 179 St / QBL (S15/M15) [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project repairs or replaces one subway street stair at 179 St on the Queens Blvd Line to improve safety and station access. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8']","prime_contractor":"INNOVATIVE CONSTRUCTION & MGMT. CO INC","contract_number":"A37864","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2026-10-02T00:00:00.000","estimated_actual_completion_date":"2026-10-02T00:00:00.000","goal_project_cost":"897119","estimated_actual_project_cost":"897119"},
{":id":"row-7kcq.ysdx.dnmm",":version":"rv-46e6-frpa.ufqg",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13409","title":"1 Subway Street Stair: 169 St / QBL (S2) [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"Station stairs need periodic replacement to stay safe and functional. This project repairs or replaces one subway street stair at 169 St on the Queens Blvd Line. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8']","prime_contractor":"PPS(USA) CONSTRUCTION INC","contract_number":"A37865","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"2","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2026-10-30T00:00:00.000","estimated_actual_completion_date":"2026-12-31T00:00:00.000","goal_project_cost":"967330","estimated_actual_project_cost":"967330"},
{":id":"row-53a3_c2mr~ntst",":version":"rv-ai8y-yeym_ta3s",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13412","title":"1 Subway Street Stair: Queens Plz / QBL (S5/M5A/B/C) [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Stations']","description":"This project repairs or replaces a stair. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8']","prime_contractor":"MR RESTORATION CORP","contract_number":"A37868","budget_status":"1","schedule_status":"1","start_date":"2026-03-01T00:00:00.000","goal_completion_date":"2026-12-18T00:00:00.000","estimated_actual_completion_date":"2026-12-18T00:00:00.000","goal_project_cost":"918520","estimated_actual_project_cost":"918520"},
{":id":"row-2mfv~q8cx-kgrn",":version":"rv-ztrq.jxwx.2bp8",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13413","title":"1 Subway Street Stair: Jamaica Center / ARC (S1/M1/M3)[SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project repairs or replaces one subway street stair at Jamaica Center on the Archer Av Line to improve safety and station access. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8']","prime_contractor":"YAM CONTRACTOR CORP","contract_number":"A37869","contract_type":"DBB (SBMP)","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2026-10-23T00:00:00.000","estimated_actual_completion_date":"2026-10-23T00:00:00.000","goal_project_cost":"1264235","estimated_actual_project_cost":"1264235"},
{":id":"row-692i_5r7u_2c6y",":version":"rv-5uis~bm77_ktb9",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13415","title":"1 Subway Interior Stair: 14 St / 8AV (P7) [SBMP]","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Stations']","description":"This project repairs or replaces a stair. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","prime_contractor":"JPR BUILDERS 07 INC.","contract_number":"A37871","budget_status":"1","schedule_status":"2","start_date":"2026-02-01T00:00:00.000","goal_completion_date":"2026-11-24T00:00:00.000","estimated_actual_completion_date":"2026-12-12T00:00:00.000","goal_project_cost":"771483","estimated_actual_project_cost":"771483"},
{":id":"row-dstd-uuef.nb29",":version":"rv-5pee-56z2-4j5d",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13429","title":"Design-Build Services for ADA Upgrades Package 11","stage":"Procurement","phase":"Active Procurement","agencies":"['New York City Transit']","asset_categories":"['Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making three stations accessible - 110 St (6), 145 St (A,B,C,D), and Wakefield-241 St (2).","initiatives":"['Accessibility']"},
{":id":"row-v744~ibbs_w4q8",":version":"rv-a75q.bmcq~dzns",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13478","title":"Purchase 131 Express Buses","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Buses']","description":"This project purchases new express buses for New York City Transit to modernize the fleet and support reliable service.","capital_plans":"['9']","prime_contractor":"MTA BUS COMPANY","contract_number":"B40735","contract_type":"Purchase (RFP)","budget_status":"1","schedule_status":"0","start_date":"2025-07-01T00:00:00.000","goal_completion_date":"2027-03-31T00:00:00.000","estimated_actual_completion_date":"2026-05-15T00:00:00.000","goal_project_cost":"131195796","estimated_actual_project_cost":"131195796"},
{":id":"row-zt64.d9br.tc4s",":version":"rv-stwd_pzqf.jbj7",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13479","title":"NYCT ADA Station Improvements: 42 St - Bryant Park Complex","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making the Bryant Park-5 Av subway station complex accessible and improving the station environment. This project will make both the Bryant Park-42 St B/D/F/M and 5 Av 7 stations newly accessible with new elevators, wider staircases, and new ADA-compliant boarding areas, in addition to making critical state of good repair improvements.","services":"['NYCT-B', 'NYCT-D', 'NYCT-F', 'NYCT-M', 'NYCT-7']","capital_plans":"['8', '9']","districts":"['CO-061']","prime_contractor":"PAUL J. SCARIANO, INC.","contract_number":"A37149","contract_type":"Design Build","initiatives":"['Accessibility','Enabled by Congestion Relief']","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2028-11-30T00:00:00.000","estimated_actual_completion_date":"2028-11-30T00:00:00.000","goal_project_cost":"134356237","estimated_actual_project_cost":"134356237"},
{":id":"row-v5ea_uuum~ifxe",":version":"rv-4x83.vjmx_sdce",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13560","title":"Station State of Good Repair Work - Package 2 (27 Stations / Various Lines)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Track', 'Passenger Stations']","description":"This package delivers comprehensive station state-of-good-repair work to renew deteriorated components and improve safety, reliability, and the station environment.","capital_plans":"['9']","contract_number":"A37882","contract_type":"Design Build"},
{":id":"row-sdnd.dwz2~4yt3",":version":"rv-32t6-dvst_ecfs",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13595","title":"Column Repairs: Rockaway, New Lots, and Liberty","stage":"Procurement","phase":"Active Procurement","agencies":"['New York City Transit']","asset_categories":"['Line Structures']","description":"Line structures—bridges, viaducts, and tunnels—need sustained investment to slow deterioration. This project performs structural repairs and protections for column bases across multiple elevated lines."},
{":id":"row-zd6h.rp9h~zx54",":version":"rv-cif2-axfc-qu7z",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13692","title":"Station State of Good Repair Work - Package 3 (10 Stations / West End Line)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Track', 'Passenger Stations']","description":"This package delivers comprehensive station state-of-good-repair work to renew deteriorated components and improve safety, reliability, and the station environment.","capital_plans":"['9']","contract_type":"Design Build"},
{":id":"row-a428~z3zr.dt59",":version":"rv-zquk~8auf~zyiu",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"13983","title":"Purchase 45 Locomotives","stage":"Construction","phase":"Construction","agencies":"['New York City Transit']","asset_categories":"['Service Vehicles']","description":"This project purchases new diesel-battery hybrid locomotives that support maintenance and construction work across the subway system while reducing emissions in tunnel environments.","capital_plans":"['9']","contract_number":"R34221","contract_type":"Purchase (RFP)","budget_status":"1","schedule_status":"0","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2031-09-30T00:00:00.000","estimated_actual_completion_date":"2029-09-30T00:00:00.000","goal_project_cost":"416326665","estimated_actual_project_cost":"416326665"},
{":id":"row-yfmu_776u.53bn",":version":"rv-w9yw_zben~ht6u",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14003","title":"Water Condition Remedy (2027-2028)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This project addresses water conditions at select locations to improve reliability and protect critical assets.","capital_plans":"['9']","contract_type":"DBB (IFB)"},
{":id":"row-44fv-p939~c4be",":version":"rv-ctfp_jg63_94s9",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14051","title":"Rehab Admin Facilities: Replace Boilers at 130 Livingston St","stage":"Complete","phase":"Complete","agencies":"['New York City Transit']","asset_categories":"['Misc/Emergency']","description":"This project replaces aging boiler equipment at 130 Livingston St to improve heating reliability and energy performance.","capital_plans":"['8']","contract_type":"On Call","budget_status":"1","schedule_status":"0","start_date":"2025-08-01T00:00:00.000","goal_completion_date":"2025-12-30T00:00:00.000","estimated_actual_completion_date":"2025-11-14T00:00:00.000","goal_project_cost":"2660730","estimated_actual_project_cost":"2660730"},
{":id":"row-2gnc_hfek-piv5",":version":"rv-neh9~ukzb.b3u9",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14362","title":"Miscellaneous Structural Rehabilitation at the Verrazzano-Narrows Bridge","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Bridges And Tunnels']","asset_categories":"['Structures']","description":"This project delivers targeted structural rehabilitation work at the Verrazzano-Narrows Bridge to address deterioration and extend asset life.","capital_plans":"['9']","contract_type":"DBB (A+B)"},
{":id":"row-e6n7-874p_hr9v",":version":"rv-xkcd_c3v7_ki5f",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14366","title":"Sign Gantry Upgrade at the Henry Hudson Bridge","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Bridges And Tunnels']","asset_categories":"['Roadways & Decks']","description":"This project upgrades or replaces sign gantries at the Henry Hudson Bridge to improve safety and reliability for motorists.","capital_plans":"['9']","contract_number":"HH-9M","contract_type":"DBB (A+B)"},
{":id":"row-znzn-yv59.z3fv",":version":"rv-f8wq-ma97~p75s",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14390","title":"Rehabilitation of the Governor's Island Vent Building and Brooklyn Vent Building Facade","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Bridges And Tunnels']","asset_categories":"['Buildings & Sites']","description":"This project rehabilitates facade elements at the Governor's Island Vent Building and Brooklyn Vent Building to improve safety, waterproofing, and long-term condition.","capital_plans":"['9']","contract_number":"HC-9O","contract_type":"DBB (A+B)"},
{":id":"row-wqg2_rkdj_a5sk",":version":"rv-arye_v8g8-v7tc",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14399","title":"Replacement of 13KV Substation at the Robert F. Kennedy Bridge","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Bridges And Tunnels']","asset_categories":"['Utilities']","description":"This project replaces or relocates a 13 kV substation at the Robert F. Kennedy Bridge to modernize power infrastructure and improve reliability.","capital_plans":"['9']","contract_type":"Design Build"},
{":id":"row-qx6p.zabx.mjbk",":version":"rv-fzzj.mkc2.9p6s",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14422","title":"Laser Intrusion Detection System (LIDS)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"This project includes installation of perimeter detection systems to help protect tracks from unauthorized access.","capital_plans":"['8']","contract_type":"DBB (A+B)"},
{":id":"row-yqh9_99tw_zrh7",":version":"rv-9hiq_k6sm~qvcp",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14491","title":"Column and Overhead Steel Repair: 125 St Arch and 215 St- 225 St / Broadway 7 Av Line","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Line Structures']","description":"This project repairs columns and overhead steel in targeted segments on the Broadway-7 Av Line to improve structural condition and long-term reliability.","capital_plans":"['9']","contract_number":"C42012","contract_type":"DBB (A+B)"},
{":id":"row-hdge_mvta~g6hc",":version":"rv-gcpe_fduk-5srz",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14552","title":"Reynolds Channel Viaduct and Wreck Lead Bridge Rehabilitation","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Long Island Rail Road']","asset_categories":"['Line Structures']","description":"This project rehabilitates movable bridge infrastructure, upgrading control systems and mechanical equipment, improving power redundancy, repainting steel, and repairing concrete to improve reliability and extend service life.","capital_plans":"['9']","contract_number":"6547","contract_type":"Design Build"},
{":id":"row-9j8b_53zh.bhd8",":version":"rv-8ise~5yrn~hhng",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14554","title":"Fresh Pond Yard Bridge Replacement and Yard/Main Track Reconfiguration","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Long Island Rail Road']","asset_categories":"['Line Structures']","description":"This project advances improvements to the Fresh Pond Yard to support safe, reliable operations.","capital_plans":"['9']","contract_number":"6546","contract_type":"Design Build"},
{":id":"row-ee2d-whuf_vkmi",":version":"rv-ag3w_maqq_4txk",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14640","title":"TNB Facility Painting","stage":"Construction","phase":"Construction","agencies":"['Bridges And Tunnels']","asset_categories":"['Structures', 'Structural Painting']","description":"This project delivers facility-wide painting and targeted structural rehabilitation at the Throgs Neck Bridge to protect steel and extend service life.","capital_plans":"['9']","prime_contractor":"EL SOL CONTRACTING /ES II ENTERPRISES JV","contract_number":"TN -9A","contract_type":"DBB (RFP)","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2028-10-30T00:00:00.000","estimated_actual_completion_date":"2028-10-30T00:00:00.000","goal_project_cost":"242715077","estimated_actual_project_cost":"242715077"},
{":id":"row-m3fh.rxq3-6kzi",":version":"rv-pbzk-xh8q-8eyh",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14641","title":"Installation of Fire Suppression System at Hugh L. Carey & Queens Midtown Tunnels","stage":"Construction","phase":"Construction","agencies":"['Bridges And Tunnels']","asset_categories":"['Utilities', 'Structures']","description":"We’re adding modern fire-suppression systems to the Hugh L. Carey and Queens Midtown Tunnels to improve safety. These upgrades systems will reduce smoke and heat in case of a fire condition in the tunnels.","capital_plans":"['9']","prime_contractor":"NAVILLUS CONTRACTING INC","contract_number":"HC-9R/QM-9R","contract_type":"Design Build","budget_status":"1","schedule_status":"1","start_date":"2025-12-01T00:00:00.000","goal_completion_date":"2028-11-30T00:00:00.000","estimated_actual_completion_date":"2028-11-30T00:00:00.000","goal_project_cost":"275875501","estimated_actual_project_cost":"275875501"},
{":id":"row-9qy8~fkma-9x4x",":version":"rv-aks6_6hin~mqjk",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14730","title":"Station State of Good Repair Work - Package 6 (18 Stations / Various Lines)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This package delivers station state-of-good-repair work to renew deteriorated components and improve safety, reliability, and the station environment.","capital_plans":"['8', '9']","contract_number":"A37955","contract_type":"DBB (A+B)"},
{":id":"row-j5wt~9zdv.ks73",":version":"rv-v82n_tgmb~ur76",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14731","title":"Station State of Good Repair Work - Package 7 (9 Stations / Various Lines)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"This package delivers station state-of-good-repair work to renew deteriorated components and improve safety, reliability, and the station environment.","capital_plans":"['8', '9']","contract_number":"A37956","contract_type":"DBB (A+B)"},
{":id":"row-pe66-vtp4.b72n",":version":"rv-negy.8a2t~7559",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14744","title":"Electronic Security System: 1 Station Complex, Brooklyn","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit']","asset_categories":"['Signals & Communications']","description":"This project upgrades electronic security systems at a station complex in Brooklyn to support safer operations and improved incident response.","capital_plans":"['9']","contract_number":"C52173","contract_type":"DBB (A+B)"},
{":id":"row-4ndu-kdgh-ude6",":version":"rv-4b5j~64w3-yjwy",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14757","title":"Design Build Services for Westbound Bypass Part 2","stage":"Procurement","phase":"Active Procurement","agencies":"['Long Island Rail Road']","asset_categories":"['Track & Structures']","description":"This project will build new grade-separated railroad track to help remove conflicts and improve train movements into the East River Tunnel.","capital_plans":"['8']"},
{":id":"row-zme3~3shx_4gsx",":version":"rv-tagg.hr3d.qh5h",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14768","title":"ADA Station Improvements - Package 3","stage":"Procurement","phase":"Active Procurement","agencies":"['Long Island Rail Road']","asset_categories":"['Stations']","description":"As part of the MTA’s commitment to systemwide accessibility, we are making LIRR Bellerose and Floral Park stations accessible and making significant station improvements.","capital_plans":"['9']","initiatives":"['Accessibility']"},
{":id":"row-vjzx-cv37-r6ri",":version":"rv-vs52.e2wz-687p",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14769","title":"Main St & North Sea Rd Bridge Painting","stage":"Construction","phase":"Construction","agencies":"['Long Island Rail Road']","asset_categories":"['Line Structures']","description":"This project rehabilitates and repaints select LIRR bridges over Main St and North Sea Rd to provide protective coatings that slow corrosion and extend service life.","capital_plans":"['8']","prime_contractor":"TECTONIC ENGINEERING CONSULTANTS","contract_number":"D81628L","budget_status":"1","schedule_status":"1","start_date":"2025-08-01T00:00:00.000","goal_completion_date":"2026-12-15T00:00:00.000","estimated_actual_completion_date":"2026-12-15T00:00:00.000","goal_project_cost":"3428925","estimated_actual_project_cost":"3428925"},
{":id":"row-6vbi-vtgq~i458",":version":"rv-3v7s~6v37~48st",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14770","title":"Medford Ave and North Country Rd Bridge Painting","stage":"Construction","phase":"Construction","agencies":"['Long Island Rail Road']","asset_categories":"['Line Structures']","description":"This project rehabilitates and repaints select LIRR bridges, including structures over Medford Ave and North Country Rd, to provide protective coatings that slow corrosion and extend service life.","capital_plans":"['8']","prime_contractor":"MADHU CONSTRUCTION CORPORATION","contract_number":"6516R","budget_status":"1","schedule_status":"1","start_date":"2025-11-01T00:00:00.000","goal_completion_date":"2026-12-15T00:00:00.000","estimated_actual_completion_date":"2026-12-15T00:00:00.000","goal_project_cost":"5411214","estimated_actual_project_cost":"5411214"},
{":id":"row-emap_2ewp_2e8y",":version":"rv-y7f7.mwhi-9ajq",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14771","title":"West Hempstead and Winfield Substation Replacements","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Long Island Rail Road']","asset_categories":"['Power']","description":"This project replaces substations at West Hempstead and Winfield to modernize aging infrastructure and improve power reliability.","capital_plans":"['9']","contract_type":"Design Build"},
{":id":"row-gmbw-radb_ns8p",":version":"rv-mddy_a7si.3yt9",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14775","title":"Island Park Paving - SBMP","stage":"Construction","phase":"Construction","agencies":"['Long Island Rail Road']","asset_categories":"['Stations']","description":"This project rehabilitates pavement, drainage, pedestrian paths, and ADA features at Island Park, making access safer and more comfortable for customers. Delivered through the MTA's Small Business Mentoring Program (SBMP), which helps small firms build capacity to deliver MTA work.","capital_plans":"['8']","prime_contractor":"V.I.V. CONTRACTING CORP.","contract_number":"6528","budget_status":"1","schedule_status":"2","start_date":"2025-11-01T00:00:00.000","goal_completion_date":"2027-02-15T00:00:00.000","estimated_actual_completion_date":"2027-03-04T00:00:00.000","goal_project_cost":"5050000","estimated_actual_project_cost":"5110000"},
{":id":"row-6ry4.ipmp~kk2v",":version":"rv-2hv8-xhb7-qgsb",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14776","title":"Rehabilitation of 5 Harlem Line Stations","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Metro-North Railroad']","asset_categories":"['Stations']","description":"This project rehabilitates Hartsdale, Scarsdale, Crestwood, Chappaqua, and Pleasantville Metro-North Harlem Line stations through platform and canopy work, circulation and accessibility improvements, and upgrades to customer information and safety systems.","capital_plans":"['8', '9']","contract_type":"Design Build"},
{":id":"row-vczb_y7xw_f7pm",":version":"rv-4asc-r3ju_w4cc",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14790","title":"Bridge Painting (Seaford Oyster Bay & Wantagh Parkway)","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Long Island Rail Road']","asset_categories":"['Line Structures']","description":"This project advances design for painting and protective coating work on select LIRR bridges over the Seaford-Oyster Bay Expressway and the Wantagh State Parkway to protect steel and extend service life.","capital_plans":"['8', '9']","contract_number":"6549","contract_type":"DBB (A+B)"},
{":id":"row-nj3h_uy34-3yv4",":version":"rv-ddr3.6qsw_cx59",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14804","title":"Security Towers at the Marine Parkway Bridge and Cross Bay Bridge","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Bridges And Tunnels']","asset_categories":"['Structures']","description":"This project installs or upgrades security towers at the Marine Parkway Bridge and Cross Bay Bridge to support monitoring and incident response.","capital_plans":"['9']","contract_type":"DBB (A+B)"},
{":id":"row-w5nm_457x.hzjf",":version":"rv-hqw2_s7zk_ifpt",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14819","title":"Sign Gantry Upgrades at the Marine Parkway Bridge and Cross Bay Bridge","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Bridges And Tunnels']","asset_categories":"['Roadways & Decks']","description":"This project upgrades or replaces sign gantries at the Marine Parkway Bridge and Cross Bay Bridge to improve safety and reliability for motorists.","capital_plans":"['9']","contract_number":"CB-9X","contract_type":"DBB (A+B)"},
{":id":"row-kura-svnj~663v",":version":"rv-i42m-jvae-a2tf",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14821","title":"DB Services for Metro-North Railroad Hudson Line Bundle","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Metro-North Railroad']","asset_categories":"['Power', 'Track & Structures']","description":"This project will electrify two non-powered segments of the Hudson Line south of Croton Harmon to provide added reliability and flexibility to ensure that emergency or other track outages do not diminish Metro-North’s ability to run existing service. Additionally, having all tracks electrified provides operational flexibility for capital and maintenance construction work along the right of way in this busy section of the Hudson Line.","capital_plans":"['8', '9']","contract_type":"Design Build"},
{":id":"row-zapt_u3x4.fkkp",":version":"rv-m7xw.k74b~4g9i",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14852","title":"West Side Yard Mitigation Construction","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['Long Island Rail Road']","asset_categories":"['Track', 'Shops & Yards']","description":"As part of the MTA’s resilience program, we’re protecting the LIRR West Side Yard from future storm surges by installing a new emergency storm-water pumping system and protective barrier, reducing flood risk and keeping operations reliable.","capital_plans":"['5', '9']","contract_type":"Design Build"},
{":id":"row-sr4y~ndtv.bvq5",":version":"rv-9fbb-8ttt.ghki",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14853","title":"Atlantic Terminal Water Remediation & Structural Repairs","stage":"Procurement","phase":"Upcoming Procurement","agencies":"['New York City Transit', 'Long Island Rail Road']","asset_categories":"['Passenger Stations', 'Stations']","description":"This project investigates and addresses water leaks and water damage within areas of the Atlantic Av-Barclays Center complex to improve station condition and reduce ongoing deterioration.","capital_plans":"['8', '9']","contract_number":"6537","contract_type":"DBB (A+B)"},
{":id":"row-85dq-tx2t-vsyk",":version":"rv-q8iv.268d_j4aw",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"14918","title":"Design-Build Services for Track Intrusion Detection Systems (TIDS) at Two Stations","stage":"Procurement","phase":"Active Procurement","agencies":"['New York City Transit']","asset_categories":"['Signals & Communications']","description":"This project will demonstrate the feasibility, performance, and reliability of an artificial intelligence–supported approach to right-of-way intrusion detection and awareness.","capital_plans":"['8']","contract_number":"C40001"},
{":id":"row-893c_sua6~gmfa",":version":"rv-h8si_9m84.x65y",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999901","title":"25-29 NYCT Signal Modernization Program","stage":"Planning","phase":"Planned","agencies":"['New York City Transit']","asset_categories":"['Signals & Communication']","description":"Modern subway signaling technology has dramatically improved service performance on the L, the 7, and segments of the E/F/M/R where it has been installed. With this Capital Plan, the MTA will replace at least 75 miles of outdated signals with Communications Based Train Control (CBTC) on the Broadway N/Q/R/W Line, Liberty Av A Line, Rockaway A/S Line, and Nassau St J/Z Line. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['NYCT-2', 'NYCT-3', 'NYCT-4', 'NYCT-5', 'NYCT-A', 'NYCT-C', 'NYCT-H', 'NYCT-J', 'NYCT-M', 'NYCT-N', 'NYCT-Q', 'NYCT-R', 'NYCT-W', 'NYCT-Z']","capital_plans":"['9']","districts":"['CO-081', 'CO-061', 'CO-047']","initiatives":"['Signal Modernization', 'Reliability']"},
{":id":"row-fyhc-dcwu.uurb",":version":"rv-stij-75dg.cnwm",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999902","title":"25-29 NYCT ADA Improvements (incl. SIR)","stage":"Planning","phase":"Planned","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"The MTA is committed to improving transit access for everyone, including customers with disabilities, people traveling with children in strollers, seniors, and more. The 2025-2029 Capital Plan continues the MTA's commitment to make the system more accessible, with at least 60 more subway stations slated for ADA improvements. With these investments, approximately 70% of all subway rides will take place to or from accessible stations – and we’ll stay on track to make 95% of subway stations accessible by 2055. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['NYCT-R', 'NYCT-W', 'NYCT-N', 'NYCT-Q', 'NYCT-B', 'NYCT-J', 'NYCT-Z', 'NYCT-M', 'NYCT-L', 'NYCT-C', 'NYCT-E', 'NYCT-A', 'NYCT-S', 'NYCT-D', 'NYCT-F', 'NYCT-G', 'NYCT-1', 'NYCT-3', 'NYCT-2', 'NYCT-5', 'NYCT-6', 'NYCT-7', 'NYCT-SIR']","capital_plans":"['9']","districts":"['CO-061', 'CO-047', 'CO-081', 'CO-005', 'CO-085']","initiatives":"['Accessibility']"},
{":id":"row-mzj8-jkxd~9h52",":version":"rv-fgtp-idck.u3y3",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999903","title":"25-29 NYCT Station Elevator & Escalator Replacements","stage":"Planning","phase":"Planned","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"The MTA is committed to improving transit access for everyone, including customers with disabilities, people traveling with children in strollers, seniors, and more. The 2025-2029 Capital Plan will replace at least 45 elevators and 43 escalators across the subway system to make them more reliable for riders. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['NYCT-N', 'NYCT-Q', 'NYCT-R', 'NYCT-W', 'NYCT-M', 'NYCT-L', 'NYCT-A', 'NYCT-C', 'NYCT-B', 'NYCT-D', 'NYCT-F', 'NYCT-G', 'NYCT-E', 'NYCT-1', 'NYCT-2', 'NYCT-3', 'NYCT-4', 'NYCT-5', 'NYCT-7']","capital_plans":"['9']","districts":"['CO-061', 'CO-047', 'CO-081', 'CO-005']"},
{":id":"row-xj6z-9qt2_bkyp",":version":"rv-aeef-vdvx-iewc",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999905","title":"25-29 NYCT Station Renewals","stage":"Planning","phase":"Planned","agencies":"['New York City Transit']","asset_categories":"['Passenger Stations']","description":"The MTA is committed to ensuring customers feel comfortable and safe throughout our stations.  In the 2025-2029 Capital Plan, the MTA will repair infrastructure elements, add new safety features, improve customer communications, and invest in other measures to enhance the customer experience in subway stations. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['NYCT-A', 'NYCT-B', 'NYCT-C', 'NYCT-M', 'NYCT-R', 'NYCT-6', 'NYCT-7']","capital_plans":"['9']","districts":"['CO-061', 'CO-081']"},
{":id":"row-9x7f_4tc4-y5ed",":version":"rv-9nar_ivkn_ggxk",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999906","title":"25-29 NYCT Line Structure Paint/Repair","stage":"Planning","phase":"Planned","agencies":"['New York City Transit']","asset_categories":"['Line Structures']","description":"Line structures provide a safe right-of-way for subway trains above and below ground. NYCT’s network of 251 miles of line structures, have not received adequate investment in past Capital Plans and the rate of deterioration is now accelerating. The 2025-2029 Capital Plan is increasing the pace of investment on these structures, including a new, more comprehensive approach to overcoating protection that will double the life of the elevated structures. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['NYCT-1', 'NYCT-2', 'NYCT-3', 'NYCT-4', 'NYCT-5', 'NYCT-6', 'NYCT-7', 'NYCT-A', 'NYCT-B', 'NYCT-F', 'NYCT-H', 'NYCT-N', 'NYCT-Q', 'NYCT-R', 'NYCT-W']","capital_plans":"['9']","districts":"['CO-081', 'CO-047', 'CO-005', 'CO-061']","initiatives":"['Safety']"},
{":id":"row-get8~g8nw_3w28",":version":"rv-j866-fwza~x53p",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999908","title":"25-29 NYCT Substation Renewals","stage":"Planning","phase":"Planned","agencies":"['New York City Transit']","asset_categories":"['Traction Power']","description":"MTA substations convert high-voltage AC power from utility providers into 650-volt DC power that moves trains. The infrastructure required to support this extensive transit network is vast, complex and often precariously outdated. The 2025-2029 Capital Plan includes significant investments in the power system – a major step in the effort to stabilize it for the next generation.This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['NYCT-E', 'NYCT-J', 'NYCT-Z', 'NYCT-F', 'NYCT-A', 'NYCT-S', 'NYCT-B', 'NYCT-C', 'NYCT-D', 'NYCT-Q', 'NYCT-N', 'NYCT-2', 'NYCT-3', 'NYCT-L', 'NYCT-1']","capital_plans":"['9']","districts":"['CO-047', 'CO-061', 'CO-081', 'CO-005']","initiatives":"['Reliability','Sustainability']"},
{":id":"row-kuuu_mrg2.362w",":version":"rv-ev3p~8cqd_e29g",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999909","title":"25-29 NYCT Pump Rooms","stage":"Planning","phase":"Planned","agencies":"['New York City Transit']","asset_categories":"['Line Equipment']","description":"Pump rooms remove excess water from the subway system on a daily basis and are especially critical to preventing major service disruptions during heavy rainfall. The 2025-2029 Capital Plan will expanding capacity and make repairs at more than 12 pump room locations, improving overall drainage infrastructure.This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","capital_plans":"['9']","initiatives":"['Resilience']"},
{":id":"row-akb9~h2e9~vi3f",":version":"rv-rqip.q3br~s4vi",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999910","title":"25-29 LIRR Station Projects","stage":"Planning","phase":"Planned","agencies":"['Long Island Rail Road']","asset_categories":"['Stations']","description":"The MTA is committed to ensuring customers feel comfortable and safe as they wait for their train. The 2025-2029 Capital Plan will keep stations open, safe, and accessible by replacing deteriorated platforms and canopies, making targeted structural component upgrades, replacing older elevators and escalators, and expanding accessibility with the installation of new ramps and elevators. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['LIRR-10', 'LIRR-2', 'LIRR-9', 'LIRR-1', 'LIRR-3', 'LIRR-4', 'LIRR-5', 'LIRR-6', 'LIRR-7', 'LIRR-8', 'LIRR-11', 'LIRR-14', 'LIRR-12']","capital_plans":"['9']","districts":"['CO-103', 'CO-059', 'CO-081', 'CO-047']"},
{":id":"row-qvgy.xkhu-y9mm",":version":"rv-9aff~66xz.f4e7",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999911","title":"25-29 LIRR Bridge Projects","stage":"Planning","phase":"Planned","agencies":"['Long Island Rail Road']","asset_categories":"['Line Structures']","description":"The 2025-2029 Capital Plan will keep service safe and reliable by increasing the annual pace of structural rehabilitation of bridges and ensure longevity of structures by waterproofing bridge decks and repainting structural steel on approximately 45 bridges and viaducts. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['LIRR-1', 'LIRR-7', 'LIRR-2', 'LIRR-3', 'LIRR-4', 'LIRR-5', 'LIRR-6', 'LIRR-8', 'LIRR-9', 'LIRR-10', 'LIRR-11', 'LIRR-12']","capital_plans":"['9']","districts":"['CO-103']","initiatives":"['Safety']"},
{":id":"row-uvdz-6t2s.y9x6",":version":"rv-yp8z-bvgz_cieq",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999912","title":"25-29  LIRR Communications and Signal Projects","stage":"Planning","phase":"Planned","agencies":"['Long Island Rail Road']","asset_categories":"['Signals & Communication']","description":"The 2025-2029 Capital Plan will upgrade approximately 12 miles of signals on the Port Jefferson Branch and approximately 17 miles of signals on the Montauk Branch where over half of the signal components are rated in poor or marginal condition. We will also advance normal replacement of communication and signal assets like relays, cables, switch machines, and signals. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['LIRR-10', 'LIRR-5']","capital_plans":"['9']","districts":"['CO-103']","initiatives":"['Reliability']"},
{":id":"row-psr8-k8hs_2iyy",":version":"rv-8k2g.waki~fni4",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999913","title":"25-29 LIRR Power Projects","stage":"Planning","phase":"Planned","agencies":"['Long Island Rail Road']","asset_categories":"['Power']","description":"Long Island Rail Road power network is a service-critical asset that powers train service. The 2025-2029 Capital Plan will keep service safe and reliable by renewing substation components or fully replacing critical substations, replacing approximately 65,000 linear feet of conventional third rail with, and continuing the replacement of deteriorated power infrastructure. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['LIRR-8']","capital_plans":"['9']","districts":"['CO-059']","initiatives":"['Reliability','Sustainability']"},
{":id":"row-4xve~awrr-sp46",":version":"rv-8qcc-3nnu~sbzr",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999914","title":"25-29 LIRR Track Projects","stage":"Planning","phase":"Planned","agencies":"['Long Island Rail Road']","asset_categories":"['Track & Structures']","description":"Long Island Rail Road's track network consists of more than 1,000 miles of rail and 738 switches, 400 crossings, and various other equipment. The 2025-2029 Capital Plan will replace 80 miles of rail, 58 mainline switches, and up to 54 grade crossings, in addition to replacing track construction equipment and rehabilitating infrastructure at LIRR yards. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['LIRR-1', 'LIRR-2', 'LIRR-3', 'LIRR-4', 'LIRR-5', 'LIRR-6', 'LIRR-7', 'LIRR-8', 'LIRR-9', 'LIRR-10', 'LIRR-11', 'LIRR-12']","capital_plans":"['9']","initiatives":"['Reliability']"},
{":id":"row-hz6e.9ttz.dfp2",":version":"rv-mepj.rr2p-ma2c",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999915","title":"25-29 MNR ADA","stage":"Planning","phase":"Planned","agencies":"['Metro-North Railroad']","asset_categories":"['Stations']","description":"The MTA is committed to improving transit access for everyone, including customers with disabilities, people traveling with children in strollers, seniors, and more. With the 2025-2029 Capital Plan, Metro-North will continue to add elevators, ramps, and create accessible routes between platforms to make full-service stations in Metro-North-operated territory fully accessible, where feasible. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['MNR-2', 'MNR-1']","capital_plans":"['9']","districts":"['CO-119']","initiatives":"['Accessibility']"},
{":id":"row-ijer.6yrg_yvtt",":version":"rv-yxnp_j6sb.vbdn",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999916","title":"25-29 MNR Station Rehabs","stage":"Planning","phase":"Planned","agencies":"['Metro-North Railroad']","asset_categories":"['Stations']","description":"The MTA is committed to ensuring customers feel comfortable and safe as they wait for their train. The 2025-2029 Capital Plan will keep stations safe and accessible by replacing and rehabilitating degrading station platforms and other major station components and will enhance the passenger experience by repairing and replacing critical station elements. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['MNR-2', 'MNR-1']","capital_plans":"['9']","districts":"['CO-119', 'CO-027']"},
{":id":"row-zaeb.x4hk~mrs2",":version":"rv-7etj-spn7_fj5q",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999917","title":"25-29 MNR Bridge Projects","stage":"Planning","phase":"Planned","agencies":"['Metro-North Railroad']","asset_categories":"['Line Structures']","description":"Metro-North has substantial outstanding track investment needs and we must accelerate the pace of our track replacement schedule. The 2025-2029 Capital Plan will keep service safe and reliable and enhance climate resilience on Metro-North lines by increasing the pace of cyclical track replacement and rehabilitation or replacing deficient track and bridge structures. The plan will also enhance climate resilience and reduce service disruptions caused by extreme weather with targeted investments at the most vulnerable locations. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['MNR-1']","capital_plans":"['9']","initiatives":"['Safety']"},
{":id":"row-k6ij.ighu.w22m",":version":"rv-dzr5_ft3u.utmw",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999918","title":"25-29 MNR Signals","stage":"Planning","phase":"Planned","agencies":"['Metro-North Railroad']","asset_categories":"['Signals & Communication']","description":"Communications and signals assets play an essential role in Metro-North’s safety and on-time performance goals. The 2025-2029 Capital Plan will improve reliability and security by continuing to replace signals, security, radio communications, and public display systems and making improvements at grade crossings. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['MNR-1']","capital_plans":"['9']","initiatives":"['Reliability']"},
{":id":"row-bscw_7jhd-nrvn",":version":"rv-72it-bq9h~csut",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999919","title":"25-29 MNR Substation Projects","stage":"Planning","phase":"Planned","agencies":"['Metro-North Railroad']","asset_categories":"['Power']","description":"Metro-North's power network is a service-critical asset that powers train service and is in dire need of investment. The 2025-2029 Capital Plan will improve service reliability by adding new permanent substations, replacing major components in existing substations, and improving other power transmission components. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","capital_plans":"['9']","initiatives":"['Reliability','Sustainability']"},
{":id":"row-z74g_gu78-nbvm",":version":"rv-km5n~9svg~p4p7",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999920","title":"25-29 MNR Resilience Projects","stage":"Planning","phase":"Planned","agencies":"['Metro-North Railroad']","asset_categories":"['Track & Structures']","description":"Flooding related to extreme weather events greatly threaten Metro-North operations. The 2025-2029 Capital Plan will implement resilience measures that will protect Metro-North lines against increasingly frequent extreme weather events, including drainage improvements at Mott Haven Yard and other interventions. This page represents candidate locations identified in the 2025-2029 Capital Plan and is not a comprehensive list of locations within this element. As projects are developed and awarded, locations may change and additional locations may be identified.","services":"['MNR-1']","capital_plans":"['9']","initiatives":"['Resilience']"},
{":id":"row-mhw9-45qe~hhjd",":version":"rv-j8hi_uh55_8yzr",":created_at":"2026-10-23T15:16:23.968Z",":updated_at":"2026-10-23T15:16:23.968Z","project_id":"9999921","title":"Interborough Express","stage":"Planning","phase":"Planned","agencies":"['MTA Capital Construction Company']","description":"The Interborough Express is a transformative rapid transit project that will connect currently underserved areas of Brooklyn and Queens. It will substantially cut down on travel times between the two boroughs, reduce congestion, and expand economic opportunities for the people who live and work in the surrounding neighborhoods. The project would be built along the existing, LIRR-owned Bay Ridge Branch and CSX-owned Fremont Secondary, a 14-mile freight line that extends from Bay Ridge, Brooklyn, to Jackson Heights, Queens. It would create a new transit option for close to 900,000 residents of the neighborhoods along the route, along with 260,000 people who work in Brooklyn and Queens. It would connect with up to 17 different subway lines, as well as Long Island Rail Road, with end-to-end travel times anticipated at less than 40 minutes.","capital_plans":"['9']","districts":"['CO-081','CO-047']","initiatives":"['System Expansion']"}
]